Forum quick links
Can 1 of 4 buildings on one site pursue LEED for Homes Midrise?
posted by Katrina Morgan on
Proposing on a project that has four buildings. 3 buildings are 100% residential. 1 building is mixed-use with 25% retail + office, and 75% residential.
presence sensors
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In a building that I’m going to model presence sensors are installed in all the internal spaces. It is an education center.
Whole building LCA - embodied and operational impacts
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Henrique Mendonca on
Let’s suppose a building is designed to use a material that although it has high embodied energy (concrete), it will improve the operational thermal performance due to thermal mass and the overall
Water Teatment Plant
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Alejandro Alfaro on
Option 2 of this credit requieres to treat 50% of wastewater on-site to tertiary standards.
Testing for Residential
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Donald Green on
I have read the threads for this credit as well as any LI that I could find to determine the amount of testing locations required.
ACP Regional Materials Calculator
CI-2009 MRc5:Regional Materialsposted by Charles Nepps on
I found a draft copy of "ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S." from 2011.
Core and Shell Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Gustav Alfaro on
Hi, we are trying to certify a core and shell office building which has an electrical meter for the common areas and independent meters for the tenants, but we don't have access to the electricity
Pellets
NC-2009 EAc2:On-Site Renewable Energyposted by Emmanuel Pauwels on
Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?
Appeal process
posted by Marcio Alberto Casado Pereira on
Folks, This is our first time submitting an appeal. As I clicked on "submit for review" under the "timeline" tab i was redirected to that screen where you select the credits you want to submit.
Process Loads
CS-2009 EAp2:Minimum Energy Performanceposted by Rodrigo Vazquez on
We are working on a project in Mexico City, to comply with the prerequisite 2 we are following Option 1, whole building energy simulation. In the first simulation we´d done of the energy model we c