Forum quick links
Support an Existing Farm
Pilot-Credits SSpc82:Local food productionposted by Tess Doeffinger on
In order for a school to meet Option 3: Supporting a local Farm, does there have to be both a financial contribution and volunteering involved or can it just be one of them?
Pilot credit "Walkable Project Sites" double-dips with SSc2?
NC-2009 SSc2:Development Density and Community Connectivityposted by GTF CPRE on
Our campus student union is considering an Innovation Credit using v4 pilot credit 14: Walkable Project Sites.
Acetone Based Dye Stains
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rebecca Bryant on
I read the string of comments on acetone being used as a floor stripper in polished concrete applications.
Audit Documentation
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Trevor Gilbert on
I am working on an office building that is 16 floors with each floor approximately 18,000 sf.
Daylighting in ECB Method
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Benson on
I know that I can take credit for automatic daylighting controls under the Performance Rating Method of Appendix G.
Rubber Grating
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Charline SEYTIER on
There's been discussions about rubber mats but we are dealing with a question concerning rubber grating that will come with a non-slip metal frame. Per our understanding, being grates, no weekly m
Breaks, Holidays, and PTO
NC-2009 PIf3:Occupant and Usage Dataposted by Jamison Hill on
Hey LEEDUsers, How should we account for lunch break, paid holidays, and annual leave/PTO in our FTE calculations? 1.
Zero Lot Line Building
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jamison Hill on
My Building is a zero lot line building. The front of the building directly abuts a public sidewalk and the sides abut adjacent buildings.
Ventilation rates for manufacturing facilities
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Omar Delgado on
I'm analyzing a manufacturing plant which is 70% manufacturing space and 30% warehouse. Do I need to follow the ACGIH Industrial Ventilation Manual to comply with this credit ?
No documents to prove compiance
CS-2009 SSc1:Site Selectionposted by Saud Abdul Rasheed on
Hello everyone, For pursuing this credit we need the documents mentioned above. What if all these documents cannot be furnished as the project is located outside the US?