Daylight measurement requirements...

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rick Alfandre  on 

I am not finding any parameters for the daylight measurement option as far as times of day or other issues.

1
Mon Oct 7, 2013, 12:24 pm

20% Documentation Requirement

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Elliot Powers, LEED AP BD+C  on 

I cannot seem to find any language, either in the RG, LEED Online credit form, or in any prior discussions here that specifies how this 20% requirement applies.

1
Mon Oct 7, 2013, 12:52 am

Stone counter adhesive/filler - problem with VOCs

Homes-v2008 MRc2:Environmentally preferable products
posted by  Melanie Loftus  on 

I'm running into a problem on more than one LEED-H project. There is a product, Superior Knife Grade, that is used as adhesive and filler in stone counters.

1
Mon Dec 23, 2013, 8:22 pm

Project boundary for addition and major renovation

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  kelly ryan  on 

I am Working on a project with a 2 story addition. A portion of the project includes a major renovation to the building entry. My question lies with where to define the project boundary.

1
Mon Oct 21, 2013, 11:27 pm

FTE and Peak Transients for Luxury Commercial Centre

Calculating FTEs
posted by  Ian McCall  on 

I am working on certifying a High-high end Luxury Commercial Centre. 80-90% of the clientele are rich foreigners and their purchases are very high-end luxury products.

1
Tue Oct 8, 2013, 12:35 pm

Form Release Spray VOC limit

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Crissy Tsai  on 

Under Rule 1113; June 3, 2011 Architectural Coatings: Form Release Compounds have a current limit of 250 g/L and then 1/1/14 it drops to 100 g/L.

1
Tue Oct 8, 2013, 11:23 am

SSc4.1 School Documentation Map

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Armen Isagholi  on 

I submitted for this credit and received the comments back with a pending designation...I am complying with Option 1 - Bus Rapid Transit station but they want to see a revised site drawing showing

1
Mon Oct 21, 2013, 11:52 pm

Must the space for the Systems 9 and 10 be heated?

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir/madam, For the area of mechanical ventilation, the actual design has no heating but ventilation.

1
Wed Oct 9, 2013, 7:34 pm

the fan power of Systems 9 and 10

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir/madam, Per the Revised Section 1 4 Tables (Dec 2012), for Systems 9 and 10,the fan power=0.3*supply air flow rate(cfm).

1
Wed Oct 9, 2013, 8:53 pm

SSc4.3 SSc4.4.

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Marco Antonio  on 

Hello friends! I am following the certification of an institutional building where we were given the credits and SSc4.3 SSc4.4. Occurred to acquire more land for parking garage where we use and we