Forum quick links
How to justify Er variables
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Tam Kin Hung on
The project is using VAV system and the total supply to each zone (Vdzd) accounts for both primary air and local recirculated air.
Shaded Roofs
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Ahmed Mosa on
Does a shaded roof still have to comply with SRI requirement? The roof is heavily shaded with structures from the upper levels Thanks A
Dear All, Im so confused!
posted by Milena Petrosian on
Hi Everyone! If someone can help me please! Just opening another store with long hours. (cupcake shop, Polkatots Cupcakes). I have 5 employees. 3 Part-Time and 2 Full-Time.
NC2.2 -> EBOM 2009 - baseline changes
EBOM-2009 WEc3:Water Efficient Landscapingposted by David Faltenhine on
Are there any significant changes in the baselines for WEc3 between NC 2.2/2008 and EBOM 2009?
Option D
NC-2009 EAc5:Measurement and Verificationposted by Radwa Amin on
Hello there, My project team wants to add the M&V however we are facing physical constraints on adding digital meters for all the electro-mechanical systems. Could we count on the logical mea
Concrete Waste
NC-2009 MRc2:Construction Waste Managementposted by sompoche sirichote on
We have a good amount of concrete scrap that we intend to use as backfilling material on-site and at another site. Will this be considered as waste diversion? Thanks.
building fills site...
NC-2009 WEc1:Water Efficient Landscapingposted by Carrie Laurendine on
Im documenting LEED credits for a building that re-uses an existing site in downtown area (the building footprint completely fills the site). Thus, there are no vegetated areas (no green roof eith
Project Setup : Combined wanted to change to Split review
posted by Tze Higby on
My project has registered as a standard combined application -Design & Construction in one application. This happened at the beginning of the year, already paid and all.
Computer room units
NC-2009 EAp2:Minimum Energy Performanceposted by HOUCINE TLEMSANI on
I am working on a project under LEED NC 2009 where the com Rooms and server rooms are served by computer room units (CRAC) with dehumidification and reheat.
Heat Island Effect - Roof Exemplary Performance
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Daniel Joseph on
Does any one know how the Exemplary Performance for this credit is achieved?