What was your LEED deliverable after the site assessment?
Healthcare-v2009 SSp2:Environmental site assessmentposted by Jill DeMarotta on
What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-
Conditioned vs. unconditioned & natural ventilation
NC-2009 EAc1:Optimize Energy Performanceposted by SmithGroup BG+LU FW on
Table G3.1 in Appendix G requires only conditioned space be simulated as being both heated and cooled in the proposed design.
Option 2 - portion of residential street meets 10 units per acre
NC-2009 SSc2:Development Density and Community Connectivityposted by Jay DeVilbiss on
Hello, I have a question regarding the requirement for a residential neighbourhood meeting a min density of 10 units per acre for Option 2 - Community Connectivity.
dorm bike storage
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Brian Wolfe on
Is it acceptable to pursue bike storage on the premise that the secured, covered storage is the dorm/apartment.
pre-rinse spray faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Sheryl Swartzle on
Working on my 1st project that includes a pre-rinse spray faucet for a restaurant/cafe type setting. What should should be shown as the total daily uses and the duration on the template?
Do you submit form during Design or Construction Review phase?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nicole Kimoto on
For the EAp1 form, I'm confused as to whether I am supposed to fill out this form for the design preliminary review, because this is a Construction credit? Can someone please clarify?
PIf2: square footage of all parking areas
NC-2009 PIf2:Project Summary Detailsposted by Michael Kros on
Does anyone know if the 'square footage of all parking areas' includes the drives as well, or is it only the parking stalls themselves?
LEED EBOM for Hydroelectric Power Plant?
posted by Silvia Ruiz on
Hi, My question is regarding the feasability of certifying a hydroelectric power plant facility under the LEED EBOM Rating System.
Dual toilet flush rate average
CI-2009 WEc1:Water Use Reductionposted by Mike D on
If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c
Room by room versus Apartment calculations
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Michael Wironen on
Our project is a 14-floor residential project. We are pursuing the prescriptive pathway for daylighting, which requires us to calculate the floor to window ratios for each room.