What was your LEED deliverable after the site assessment?

Healthcare-v2009 SSp2:Environmental site assessment
posted by  Jill DeMarotta  on 

What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-

0

Conditioned vs. unconditioned & natural ventilation

NC-2009 EAc1:Optimize Energy Performance
posted by  SmithGroup BG+LU FW  on 

Table G3.1 in Appendix G requires only conditioned space be simulated as being both heated and cooled in the proposed design.

1
Fri Aug 16, 2013, 1:02 pm

Option 2 - portion of residential street meets 10 units per acre

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Jay DeVilbiss  on 

Hello, I have a question regarding the requirement for a residential neighbourhood meeting a min density of 10 units per acre for Option 2 - Community Connectivity.

1
Fri Aug 16, 2013, 9:02 pm

dorm bike storage

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Brian Wolfe  on 

Is it acceptable to pursue bike storage on the premise that the secured, covered storage is the dorm/apartment.

1
Wed Aug 14, 2013, 6:07 pm

pre-rinse spray faucet

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sheryl Swartzle  on 

Working on my 1st project that includes a pre-rinse spray faucet for a restaurant/cafe type setting. What should should be shown as the total daily uses and the duration on the template?

1
Wed Aug 14, 2013, 6:51 pm

Do you submit form during Design or Construction Review phase?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Nicole Kimoto  on 

For the EAp1 form, I'm confused as to whether I am supposed to fill out this form for the design preliminary review, because this is a Construction credit? Can someone please clarify?

1
Wed Aug 14, 2013, 9:11 pm

PIf2: square footage of all parking areas

NC-2009 PIf2:Project Summary Details
posted by  Michael Kros  on 

Does anyone know if the 'square footage of all parking areas' includes the drives as well, or is it only the parking stalls themselves?

1
Wed Aug 14, 2013, 10:10 pm

LEED EBOM for Hydroelectric Power Plant?

LEED Rating System Selection
posted by  Silvia Ruiz  on 

Hi, My question is regarding the feasability of certifying a hydroelectric power plant facility under the LEED EBOM Rating System.

1
Mon Aug 19, 2013, 11:52 pm

Dual toilet flush rate average

CI-2009 WEc1:Water Use Reduction
posted by  Mike D  on 

If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c

1
Mon Aug 19, 2013, 3:51 pm

Room by room versus Apartment calculations

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Michael Wironen  on 

Our project is a 14-floor residential project. We are pursuing the prescriptive pathway for daylighting, which requires us to calculate the floor to window ratios for each room.

1
Thu Aug 15, 2013, 3:28 pm