EAP2 after the fact
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
Hi, Is it possible to revise and resubmit for additional points in credit EAp2 after substantial project completion?
Submittal requirements
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Greengrade User on
Once we have this category addressed can we submit this category only or do we have to submit all categories at one time?
zoning establishes maximum parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Craig Flandermeyer on
Local zoning establishes a maximum parking count vs. a minimum; does the project need to pursue the ITE parking generation option?
How should I handle this?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Valerie Molinski on
I have a current project that has a parking lot surrounded by itself and at least two other buildings. The project has 10 dedicated parking stalls as indicated in their lease.
Very alternate transportation
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Denise Dauplaise on
I'm not exactly sure where to place this question. We have a new client who may be interested in LEED for their building.
Water Metering
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Steve Gross on
Hello, My question is in regards to what need to be metered on the water side. Does the utility meter suffice or do I need to provide a meter for hot and cold water independently?
about the draws in 8.1 and 8.2
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shenhao Li on
Hello i am working on IEQ 8.1 and 8.2, I use simulation methods in 8.1. my question is that can i use diffrient draws in two credit?
output summary
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shenhao Li on
In the form, I need Provide an output summary from the daylight computer simulations. does it exist a template to do it? if not, does it need which information in the reports?
Construction Submittal
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jennifer Benedict on
Is there any additional items that are required during the construction submittal?
Simultaneity factor flushing of toilets and landscape
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Lise Dannesboe on
Hej! We are integrating a water tank in our project to supply the toilets with rainwater and to supply landscaping with water.