Forum quick links
LEED Health Care 2009 MR Prerequisite 2: PBT Source Reduction
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Andrea Breen on
For testing fly ash to be used in concrete, for the 5 ppb limit, are there any sampling requirements?
Domestic Hot Water definition
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Silvia Ruiz on
Could someone give me the definition of domestic hot water systems? Would a water heater installed for a shower or a kitchen sink be considered a domestic hot water system?
Audit during Establishment or Performance Period?
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Jaida Anderson-Lozano on
In the LEEDonline v5 form states that the audit report should be conducted and uploaded during the Establishment period. Although information here on LEEDuser and the report LEED EBOM Stress Test
FCS Wood and Pressure-Treatments
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Catherine Blakemore on
Are there and LEED requirements for FSC wood that has been pressure-treated in terms of how it impacts complying with IEQc4 - Group 4: Composite Wood, Agrifiber Products and Batt Insulation?
Building Exterior Cleaners
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Erin Holdenried on
We have a project with a stone/concrete/brick cleaner that is only used approximately every 15 years. It is biodegradable, low VOC, etc. However, it does not have GS or CCD certification.
I have a LEED-NC 2009 hotel
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susan Di Giulio on
I have a LEED-NC 2009 hotel project and I am testing various fixtures in the WEp1 template.
Industrial Flooring - Concrete Waterproofing / Sealer
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
I have an industrial flooring product that is a 3-part system (primer, waterproof membrane and topcoat (which is solid gray). It would be installed on the concrete slab of a mechanical penthouse t
Building Foot Print
NC-2009 PIf3:Occupant and Usage Dataposted by Ahmed Mosa on
We are currently working in the design of an iconic building that has 2 layers of facade.
Submittal recomendation.
NC-2009 PIf3:Occupant and Usage Dataposted by Daniel Garavito on
We are currently close to finishing all credit requirements. Do you recomend to submitt al information for review as it is completed or wait to have all ready and submitting it all at once?
Discharge rates and run off
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Sean Hogan on
Hi, In simple terms, is there a difference between 'discharge rate' and 'run off'? We are currently assessing our site to determine which case and path to follow.