Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Health Care 2009 MR Prerequisite 2: PBT Source Reduction

Healthcare-v2009 MRp2:PBT source reduction - mercury
posted by  Andrea Breen  on 

For testing fly ash to be used in concrete, for the 5 ppb limit, are there any sampling requirements?

1
Fri Mar 14, 2014, 5:16 pm

Domestic Hot Water definition

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Silvia Ruiz  on 

Could someone give me the definition of domestic hot water systems? Would a water heater installed for a shower or a kitchen sink be considered a domestic hot water system?

1
Mon Nov 4, 2013, 4:56 pm

Audit during Establishment or Performance Period?

EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Program
posted by  Jaida Anderson-Lozano  on 

In the LEEDonline v5 form states that the audit report should be conducted and uploaded during the Establishment period. Although information here on LEEDuser and the report LEED EBOM Stress Test

1
Wed Jul 31, 2013, 4:03 pm

FCS Wood and Pressure-Treatments

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Catherine Blakemore  on 

Are there and LEED requirements for FSC wood that has been pressure-treated in terms of how it impacts complying with IEQc4 - Group 4: Composite Wood, Agrifiber Products and Batt Insulation?

1
Fri Jul 26, 2013, 5:20 pm

Building Exterior Cleaners

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Erin Holdenried  on 

We have a project with a stone/concrete/brick cleaner that is only used approximately every 15 years. It is biodegradable, low VOC, etc. However, it does not have GS or CCD certification.

1
Mon Sep 2, 2013, 11:25 pm

I have a LEED-NC 2009 hotel

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susan Di Giulio  on 

I have a LEED-NC 2009 hotel project and I am testing various fixtures in the WEp1 template.

1
Mon Jul 29, 2013, 4:14 pm

Industrial Flooring - Concrete Waterproofing / Sealer

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

I have an industrial flooring product that is a 3-part system (primer, waterproof membrane and topcoat (which is solid gray). It would be installed on the concrete slab of a mechanical penthouse t

0

Building Foot Print

NC-2009 PIf3:Occupant and Usage Data
posted by  Ahmed Mosa  on 

We are currently working in the design of an iconic building that has 2 layers of facade.

1
Wed Jul 31, 2013, 7:17 pm

Submittal recomendation.

NC-2009 PIf3:Occupant and Usage Data
posted by  Daniel Garavito  on 

We are currently close to finishing all credit requirements. Do you recomend to submitt al information for review as it is completed or wait to have all ready and submitting it all at once?

1
Wed Aug 14, 2013, 9:50 pm

Discharge rates and run off

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Sean Hogan  on 

Hi, In simple terms, is there a difference between 'discharge rate' and 'run off'? We are currently assessing our site to determine which case and path to follow.

1
Mon Jul 29, 2013, 4:19 pm