Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

MERV 13 for Make-up air?

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Esteban Martinez  on 

We have a Cafeteria-Restaurant space complying with 62.1 throughout an exhaust system with make-up air directly from the outside.

1
Wed Jul 24, 2013, 6:27 pm

Electric fueling stations outside project boundary

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Bernd Schadl  on 

Our Core and Shell project is a multi-tenant business building with a parking garage (underground) and is part of a campus area with some more buildings and parking areas.

1
Wed Jul 24, 2013, 9:51 pm

Pilot Credit SSpc7 Light Pollution Reduction

Pilot-Credits SSpc7:Light pollution reduction
posted by  William Kelly  on 

We are doing a project where we are renovating the whole interior of an existing building but we are not renovating the exterior portion of the building.

1
Wed Jul 24, 2013, 8:56 pm

Timeline issue of handling waste streams

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Magda Aghababyan  on 

Hi, We conducted a waste stream audit at a facility where they divert 100% of their paper, cardboard waste, tubelights, CFL lamps etc. for recycling.

1
Wed Jul 31, 2013, 4:08 pm

Case A, B or C?

General forums
posted by  Rebecca Hart  on 

Hi, I'm trying to interpret this appendix as well and cannot get past understanding whether my project is a Case A, Case B or Case C? Can anyone shed some light on this? Thank you.

1
Thu Jul 25, 2013, 12:16 pm

SS credit 3.1 Schedules and Rides per day

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Daniel Garavito  on 

My project is 0.5 miles from Grand central station NYC, in order to achieve exemplary performance i have to state rides per day, this means for example each time subway stops in that station counts

1
Wed Aug 14, 2013, 7:17 pm

Bike sharing as "low-emitting" vehicle option?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  American University  on 

Would providing a bike sharing station for 3% of the occupants count for option 3 or 4 do you think? Would we have to provide membership to the service also?

1
Thu Jul 25, 2013, 7:31 pm

Shopping center HVAC system - Mall and tenant spaces

CS-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt on how to model the baseline HVAC system of a specific shopping center. In this project, it was specified the HVAC system which serves the mall building and some of the stores.

1
Thu Jul 25, 2013, 8:47 pm

Table PIf3-1 Space Usage Type

NC-2009 PIf3:Occupant and Usage Data
posted by  Maggie Edelstein  on 

We have parking spaces in the first floor of our building, for tenants of the project space. The square footage of the parking is not included in the project Gross Floor Area.

1
Wed Jul 31, 2013, 7:02 pm