1-year-24-hour data in the UK

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Alicia Freire  on 

Hello I am working on a project in the UK and we are struggling to get the 1 year 24 hours rainfall.

1
Sun Nov 3, 2013, 4:03 am

Low Impact Development and green infrastructure strategies

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Alicia Freire  on 

Hello When following the ACP, the LEED manual states that attenuation must be undertaken through Low Impact Development (LID) and green infrastructure strategies.

1
Tue Jul 16, 2013, 4:12 pm

Compliance with Table 7.8 - Service hot water

NC-2009 EAp2:Minimum Energy Performance
posted by  Ward Miller  on 

As far as we read the Mandatory Requirements of ASHRAE 90.1 required by EAp2, performance requirements must meet the specifications of Table 7.8.

1
Tue Jul 16, 2013, 2:54 pm

Peak transient numbers in bicycle rack calculation

Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Shivani Langer  on 

As discussed briefly above: even though the credit language states bicycle racks are to be calculated for only student and staff, LEED online form includes transient numbers in its calculations.

1
Wed Jul 17, 2013, 3:02 pm

Decomposed Granite

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Sara Rosenthal  on 

Do I need to include the areas on the site which are covered with decomposed granite in my hardscape calculation?

1
Tue Jul 16, 2013, 7:57 pm

Thermal Blocks-HVAC Zones designed

NC-2009 EAp2:Minimum Energy Performance
posted by  Elena Grau  on 

Hello, I'm working in the simulation of a building which has many HVAC zones defined so that should be modeled each ones as a separated thermical block but the zones of proposed building complies t

1
Wed Jul 17, 2013, 1:03 pm

Option 3 of SSc4.4

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Terry Squyres  on 

Our project is on a college campus and proposes to demolish an existing parking lot in order to construct a building addition.

1
Sun Nov 3, 2013, 2:12 am

SSc5.2 Case 3 including Pedestrian Hardscape

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Markus Henning  on 

Im working on a project in the pre design phase with the following spaces.

1
Thu Jul 18, 2013, 8:40 am

Locker Rooms

CI-2009 WEc1:Water Use Reduction
posted by  Graham Langton  on 

I have faucets in a locker / changing room. Reading the credit language it doesn't explicitly state that they should / shouldn't be included? Any Idea?

1
Wed Jul 17, 2013, 1:44 pm

Building Addition / DES / existing pumps in original part

NC-2009 EAp2:Minimum Energy Performance
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

I am not too sure how to interpret this situation: This project is an addition (Phase II) to an existing 5 year old building (Phase I). Phase I is LEED certified.

1
Wed Jul 17, 2013, 3:54 pm