M&V Versus Ongoing Sub-Metering & Monitoring

NC-2009 EAc5:Measurement and Verification
posted by  Andrew Ellsworth  on 

I am glad to have a forum like LEEDuser to ask this question, since this has mystified me for many years.

1
Thu Jun 20, 2013, 3:32 pm

Hi,
Our project is 133,624

NC-2009 PIf3:Occupant and Usage Data
posted by  Mike D  on 

Hi, Our project is 133,624 sf.

1
Thu Jul 25, 2013, 6:34 pm

Phased Project Executed Under Different Construction Contracts

LEED Guidance for Campuses and Multiple Buildings
posted by  Blake Thames  on 

After having registered our project (LEED NC for Schools) it was determined that the building would be constructed in two phases, one right after the other, with Phase 1 being occupied while Phase

1
Thu Jun 27, 2013, 4:28 am

LEED MRc5 Form Table

NC-2009 MRc5:Regional Materials
posted by  Nicholas Klever  on 

I am a first timer at Documenting LEED credits. I am working on MR credit 5 - regional materials.

1
Mon Nov 4, 2013, 12:26 am

Regular building occupants at research institution

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Eddie Cuevas  on 

I am working on a project at a research university. We are seeking to obtain certification for a building on campus that consists of research, classroom, and office spaces.

1
Fri Jun 21, 2013, 10:01 pm

Does anyone out there know

Schools-2009 EAp2:Minimum Energy Performance
posted by  Ema S  on 

Does anyone out there know what the following comment pertains to: Provide additional information (Mech-5C report) to verify that the Proposed Case Carrier units have been modeled at a 50% minimum

0

EAp2

Schools-2009 EAp2:Minimum Energy Performance
posted by  Ema S  on 

Does anyone out there know what the following comment pertains to: Provide additional information (Mech-5C report) to verify that the Proposed Case Carrier units have been modeled at a 50% minimum

1
Wed Aug 28, 2013, 4:45 pm

Refrigerations system

Retail-NC-v2009 EAp2:Minimum energy performance
posted by  Matteo Rigo  on 

Do the refrigeration system such as walk-in coolers or refrigeration cases must be detailed modeled in the simulation program (E+)? or is it possible consider them as a process loads?

1
Tue Nov 5, 2013, 7:05 pm

Plan Template?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Melissa Wrolstad  on 

Is there an M+V plan template for this credit? There is a template for the M+V 5.1 credit. Thanks, Melissa

1
Fri Jul 12, 2013, 7:37 pm

WE Fixture Group simple question

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rick Alfandre  on 

I apologize for the simplicity of my question, but I want to make sure I am providing accurate information. If I have a commercial office building with 2 identical unisex bathrooms with no urinals

1
Fri Jun 21, 2013, 3:18 pm