M&V Versus Ongoing Sub-Metering & Monitoring
NC-2009 EAc5:Measurement and Verificationposted by Andrew Ellsworth on
I am glad to have a forum like LEEDuser to ask this question, since this has mystified me for many years.
Hi,
Our project is 133,624
NC-2009 PIf3:Occupant and Usage Dataposted by Mike D on
Hi, Our project is 133,624 sf.
Phased Project Executed Under Different Construction Contracts
posted by Blake Thames on
After having registered our project (LEED NC for Schools) it was determined that the building would be constructed in two phases, one right after the other, with Phase 1 being occupied while Phase
LEED MRc5 Form Table
NC-2009 MRc5:Regional Materialsposted by Nicholas Klever on
I am a first timer at Documenting LEED credits. I am working on MR credit 5 - regional materials.
Regular building occupants at research institution
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Eddie Cuevas on
I am working on a project at a research university. We are seeking to obtain certification for a building on campus that consists of research, classroom, and office spaces.
Does anyone out there know
Schools-2009 EAp2:Minimum Energy Performanceposted by Ema S on
Does anyone out there know what the following comment pertains to: Provide additional information (Mech-5C report) to verify that the Proposed Case Carrier units have been modeled at a 50% minimum
EAp2
Schools-2009 EAp2:Minimum Energy Performanceposted by Ema S on
Does anyone out there know what the following comment pertains to: Provide additional information (Mech-5C report) to verify that the Proposed Case Carrier units have been modeled at a 50% minimum
Refrigerations system
Retail-NC-v2009 EAp2:Minimum energy performanceposted by Matteo Rigo on
Do the refrigeration system such as walk-in coolers or refrigeration cases must be detailed modeled in the simulation program (E+)? or is it possible consider them as a process loads?
Plan Template?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Melissa Wrolstad on
Is there an M+V plan template for this credit? There is a template for the M+V 5.1 credit. Thanks, Melissa
WE Fixture Group simple question
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rick Alfandre on
I apologize for the simplicity of my question, but I want to make sure I am providing accurate information. If I have a commercial office building with 2 identical unisex bathrooms with no urinals