Changing rooms
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by MARIA GARCIA on
Hi all, We have the showers of the project inside the ADA bathroom due to lack of space in the project.
Gross Area=Regularly occuppied + Unconditioned
NC-2009 PIf3:Occupant and Usage Dataposted by Alicia Villanueva on
We've been requested be the reviewer that the sum of regularly occuppied areas plus the unconditioned spaces mus be equal to the total gross area. We have not been requested this issue in previous
Mixed bathroom
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Alicia Villanueva on
Do mixed bathrooms count towards this credit? We have showers in the building but we don't have them separated for both female and male.
Translation to american english
NC-2009 PIf4:Schedule and Overview Documentsposted by Alicia Villanueva on
Is it mandatory to translate the mechanical drawings to american english. The project is originally designed in spanish. GH
Baseline Fan power
NC-2009 EAc1:Optimize Energy Performanceposted by S Gopikumar on
I’m modeling a typical office building which operates 5 days/40 hours per week. In order to comply with G.3.1.2.4, I broken out the fan power from system EER.
Calculating FTE- LEED for Healthcare
NC-2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
My project is a surgical addition the occupants consisting of following: FTE: doctors, nurses, aestheticians PTE: Cleaning Staff Transients: Outpatients Table Plf3-2: 1) Should Transients be
EAc5 Measurement & Verification in Multi-family Projects
NC-2009 EAc5:Measurement and Verificationposted by Josh Chapman on
Hi All, I am working on a New Construction, 299 dwelling unit Apartment building, pursuing Option D. All apartments have their own electric meter, paid directly by the tenants.
ID Credit
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Saju Varghese on
When you submit this credit as Innovation in Design for New Construction v2.2 is it required to follow up on the purchasing plan or can it be just the initial purchase since we are submitting under
Energy Modeling for a Group Certification
CS-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
We are working on an open-air shopping mall with 6 buildings arranged around a main "street". Some are attached and some aren't.
Air Curtain for Building in Climate Zone 3A
posted by Shenhao Li on
We have commecial mixed use building including retail, office and residential apartment located in climate zone 3A. these three section will have their independent main entrances.