Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Changing rooms

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  MARIA GARCIA  on 

Hi all, We have the showers of the project inside the ADA bathroom due to lack of space in the project.

1
Thu Apr 11, 2013, 5:27 pm

Gross Area=Regularly occuppied + Unconditioned

NC-2009 PIf3:Occupant and Usage Data
posted by  Alicia Villanueva  on 

We've been requested be the reviewer that the sum of regularly occuppied areas plus the unconditioned spaces mus be equal to the total gross area. We have not been requested this issue in previous

1
Fri May 3, 2013, 7:54 pm

Mixed bathroom

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Alicia Villanueva  on 

Do mixed bathrooms count towards this credit? We have showers in the building but we don't have them separated for both female and male.

1
Mon Apr 8, 2013, 5:32 pm

Translation to american english

NC-2009 PIf4:Schedule and Overview Documents
posted by  Alicia Villanueva  on 

Is it mandatory to translate the mechanical drawings to american english. The project is originally designed in spanish. GH

1
Mon Jul 1, 2013, 8:01 am

Baseline Fan power

NC-2009 EAc1:Optimize Energy Performance
posted by  S Gopikumar  on 

I’m modeling a typical office building which operates 5 days/40 hours per week. In order to comply with G.3.1.2.4, I broken out the fan power from system EER.

1
Wed Apr 10, 2013, 2:43 pm

Calculating FTE- LEED for Healthcare

NC-2009 PIf3:Occupant and Usage Data
posted by  Catherine Blakemore  on 

My project is a surgical addition the occupants consisting of following: FTE: doctors, nurses, aestheticians PTE: Cleaning Staff Transients: Outpatients Table Plf3-2: 1) Should Transients be

0

EAc5 Measurement & Verification in Multi-family Projects

NC-2009 EAc5:Measurement and Verification
posted by  Josh Chapman  on 

Hi All, I am working on a New Construction, 299 dwelling unit Apartment building, pursuing Option D. All apartments have their own electric meter, paid directly by the tenants.

1
Wed Apr 10, 2013, 2:28 pm

ID Credit

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Saju Varghese  on 

When you submit this credit as Innovation in Design for New Construction v2.2 is it required to follow up on the purchasing plan or can it be just the initial purchase since we are submitting under

1
Wed May 15, 2013, 7:24 pm

Energy Modeling for a Group Certification

CS-2009 EAp2:Minimum Energy Performance
posted by  Susan Di Giulio  on 

We are working on an open-air shopping mall with 6 buildings arranged around a main "street". Some are attached and some aren't.

1
Tue Apr 9, 2013, 2:20 pm

Air Curtain for Building in Climate Zone 3A

General forums
posted by  Shenhao Li  on 

We have commecial mixed use building including retail, office and residential apartment located in climate zone 3A. these three section will have their independent main entrances.

0