Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Drainage Pipe Capacity

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Jatuwat Varodompun  on 

Can we count the capacity of underground drainage pipes as the retention capacity? The pipe capacity will then add to the stormwater retention capacity.

1
Mon Feb 18, 2013, 12:18 pm

Defining the building type

CS-2009 EAc1:Optimize Energy Performance
posted by  Rosana Correa  on 

Hi, I have a 6 floors/2000 m² nonresidential building, and I am not sure about the system it should be. Area or number of floors is more relevant when choosing a system?

1
Mon Feb 18, 2013, 2:53 pm

SSp1 - Licensed Professional Exemption Tab

General forums
posted by  Joseph Greene  on 

Credit SSp1 includes a LPE Option for a licensed civil engineer. Can anyone assist us in changing the signature? Once we checked the box it was grayed out and became read-only.

1
Thu Mar 21, 2013, 4:10 pm

Modeling Tenant Fit-out in NC

NC-2009 EAp2:Minimum Energy Performance
posted by  Kai Starn  on 

I have a LEED-NC residential high-rise project that contains about 30% commercial space to be fit-out by a future tenant.

1
Tue Feb 19, 2013, 4:42 pm

Paint grip metal SRI

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Heather Holdridge  on 

Our project has paint grip metal roof over the structures. We tried to get the SRI value from the manufacturer but could not.

1
Tue Feb 19, 2013, 12:00 am

Rainwater Harvesting Calculator

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Erin Holdenried  on 

Does anybody know of a good rainwater harvesting calculator online anywhere? Most of the ones I have found do not let you adjust enough of the inputs to be useful.

0

WPC Doors

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Ivan Priatman  on 

The only wood products that I will be using in a project are wood plastic composite doors with no added urea-formaldehyde resins. Will I be able to comply with the credit? Many thanks.

1
Thu Feb 21, 2013, 6:50 pm

Pesticides are not stored or mixed on the building

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Ruba Al-Foraih  on 

We have a contractor that will chemically prepare and store our pesticides in his offices.

1
Thu Apr 4, 2013, 8:49 pm

How to document Squat Toilet/Hole Toilet?

CI-2009 WEc1:Water Use Reduction
posted by  Derek Fung  on 

Currently, I'm working on a CI project in China. The project locates on 19th floor, which shared by two tenants.

1
Thu Mar 21, 2013, 8:37 pm

fillers and epoxies

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Eri Spaulding  on 

Does anybody know what are these products can be categorized as under the VOC limits table? -Heavy Duty Block & Concrete Filler. -Protective & Marine coatings: Water based catalyzed epoxy.

1
Wed Mar 20, 2013, 10:02 pm