Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Flush out and un-touched area in LEED boundary

Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Todd Bundren  on 

My project includes the renovation of an existing building and a major attached addition (over 70% of the project is new construction).

1
Tue Nov 5, 2013, 1:34 am

City of LA Recycling Rates Application

CS-2009 MRc2:Construction Waste Management
posted by  Michelle Spillman  on 

We are currently using an off-site materials recovery facility that is providing documentation each month showing specific weight breakdowns for Trash, Wood, Cardboard, Dirt, Inert and Metal.

1
Mon Feb 11, 2013, 5:20 pm

PARTITIONS ARE CONSIDERED FURNITURE?

NC-2009 MRc4:Recycled Content
posted by  Florinda Garcia   on 

I would like to know if i have to consider the partitions in the LEED budget.

1
Mon Feb 11, 2013, 9:19 pm

Underground LEED Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Luis Miguel Diazgranados  on 

Greetings I'm working on an office project with underground parking. There is a LEED boundary which has been drawn for the street level, but the underground parking goes beyond this boundary.

1
Mon Feb 18, 2013, 11:53 pm

10' mat requirement with revolving door

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Jean Savitsky  on 

We have a building where there is a revolving door flanked by two hinge doors.

1
Wed Feb 13, 2013, 4:12 pm

Space by Space method

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Tejaswi Damaraju  on 

Hello, I am working for a Retail-commercial interiors project with less than 5000 Sq feet of space.

0

Energy Cost Budget Method

CI-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hello all, we have just certified a building as Core and Shell, but now the owners want to achieve also the Commercial Interior certification.

1
Tue Feb 12, 2013, 3:55 pm

Thin Client

CS-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hello all, The owners of the building we are certifying want to evaluate the effects of the thin client (form 150 W/computer to 50W/computer) on EAp2/EAc1.

1
Tue Feb 12, 2013, 3:59 pm

Conditioned Space

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

Consider a space, storage, with no heating, modelled with heating setpoint -50 degC, receives air from a central air handling unit VAV system, where the delivered air is pre-conditioned from Outdoo

1
Tue Feb 12, 2013, 3:46 pm

Already certified project

LEED Guidance for Campuses and Multiple Buildings
posted by  soha yamani  on 

i have a certified project under NC v 2009 it was registered on 5/30/2010 the certified project consist of 1- a building that consist of a ware house zone labour zone and administration zone

1
Thu Mar 21, 2013, 4:52 pm