Flush out and un-touched area in LEED boundary
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Todd Bundren on
My project includes the renovation of an existing building and a major attached addition (over 70% of the project is new construction).
City of LA Recycling Rates Application
CS-2009 MRc2:Construction Waste Managementposted by Michelle Spillman on
We are currently using an off-site materials recovery facility that is providing documentation each month showing specific weight breakdowns for Trash, Wood, Cardboard, Dirt, Inert and Metal.
PARTITIONS ARE CONSIDERED FURNITURE?
NC-2009 MRc4:Recycled Contentposted by Florinda Garcia on
I would like to know if i have to consider the partitions in the LEED budget.
Underground LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Luis Miguel Diazgranados on
Greetings I'm working on an office project with underground parking. There is a LEED boundary which has been drawn for the street level, but the underground parking goes beyond this boundary.
10' mat requirement with revolving door
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Jean Savitsky on
We have a building where there is a revolving door flanked by two hinge doors.
Space by Space method
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Tejaswi Damaraju on
Hello, I am working for a Retail-commercial interiors project with less than 5000 Sq feet of space.
Energy Cost Budget Method
CI-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, we have just certified a building as Core and Shell, but now the owners want to achieve also the Commercial Interior certification.
Thin Client
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, The owners of the building we are certifying want to evaluate the effects of the thin client (form 150 W/computer to 50W/computer) on EAp2/EAc1.
Conditioned Space
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Consider a space, storage, with no heating, modelled with heating setpoint -50 degC, receives air from a central air handling unit VAV system, where the delivered air is pre-conditioned from Outdoo
Already certified project
posted by soha yamani on
i have a certified project under NC v 2009 it was registered on 5/30/2010 the certified project consist of 1- a building that consist of a ware house zone labour zone and administration zone