Forum quick links
EA-Optimize Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Irene Carreno Rodriguez on
Hello,
General Emission Evaluation and VOC Content for signage
CI-v4 EQc2:Low emitting materialsposted by Gabriela Mena on
We are documenting a LEED/WELL project and we want to know if we must include the certification for the signage (branding, emergency exit, etc.) because we do not know in which category it should b
Retro-commission an existing PV array?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Deborah Lucking on
Our project is a county-owned building which will utilize renewable energy from an existing, adjacent, county-owned PV farm.
outdoor air quality mesurements
CS-2009 IDc1:Innovation in Designposted by Agnieszka Rylska on
One of our clients is planning to install an outdoor air quality station on his building.
Multiple CxAs?
NC-v4 EAc1:Enhanced commissioningposted by LUCY WILLIAMS on
Have any project teams had success using two different commissioning agents from two different entities in order to perform commissioning services on their project? For example, can the
Diverted vs Commingled in LEED Online Form
NC-2009 MRc2:Construction Waste Managementposted by Dionisio Franca on
Hello!
The LEED Online Form has three option under Disposal Method: Commingled, Diverted, Landfill Waste. By choosing "commingled", you can input the percentage diverted.
Treatment Requirements
NC-v4 SSc4:Rainwater managementposted by Annie Levan on
Hello,
Can someone please clarify the treatment requirements for various storm water strategies? A few example strategies are as followed:
Building eyebrows count towards area?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Nicole Kimoto on
We have a project where we have concrete eyebrows protruding from the building exterior. Would the area of those eyebrows count towards roof area?
Percent of Occupants
NC-v4 WEp2:Indoor water use reductionposted by Amy Ruffino on
On the Reduction Calculation spreadsheet, how should the "Percent of Occupants" be filled out for kitchen sinks or urinals?