Forum quick links
Previously developed and graded area by municipality - How long before construction?
NC-2009 SSc1:Site Selectionposted by Ilan Yahav on
I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006.
BUG Rating System and general equivalent standards for Ireland
CS-v4 SSc6:Light pollution reductionposted by Matt Vesey on
I'm working on an office/industrial mixed use development.
ELASTOMERS
posted by Robert Marsh on
Elastomers are the synthetic polymer having elastic properties which is used in various fields.
CARB ATCM and TSCA Title VI Test Results used for IEQc4.4?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Melanie Blacklock on
My subcontractor has submitted a Test Report showing the MDF has passed the following:
Energy savings from Battery Storage
NC-2009 EAp2:Minimum Energy Performanceposted by Vinay Shekar on
Hello,
LEED project that was certified as LEED Gold under LEED 2009 NC changes usage
posted by Konstantina Kalliakoudi on
Hello to all,
I have following issue I have a LEED project that is certified as LEED Gold under LEED 2009 NC changes usage.
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."
Self-declared reports
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Charalampos Giannikopoulos on
Is there a template of self-declared report for compliance with Option 1? Has anyone ever specified a way of complying with requirements of Option 1? Thank you.
Enhanced Commissioning LEED V4
CI-v4 EAc1:Enhanced commissioningposted by Michael Feyler on
Per the USGBC LEED V4 BD+C: New Construction Enhanced Commissioning website "The CxA may be a qualified employee of the owner, an independent consultant, or a disinterested subcontractor of the des