Guidelines/Sample of a good ESC plan proposal
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Ann E on
Tenant Lease Agreement - Required for Credit
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Lee Han on
I'm currently working on this credit, tenant work is definitely anticipated for future work. The building owner usually don't deal with lease agreements.
Greenbuild 2018 - The People's choice
posted by Anne Hicks Harney on
Greenbuild 2018 has a new feature – the People’s choice. This is where you can vote for sessions that sound interesting. I have been scrolling through this list and I am seeing a lot of
Airport terminal - 3 floors, less than 126,000 SF
CI-v4 EAp2:Minimum energy performanceposted by Stacey Olson on
Our system was modeled with a baseline of System 5 - Package VAV w/ Reheat, and is one system per floor.
LEED v4 Indoor Water use reduction or outdoor water use reduction
NC-v4 WEp2:Indoor water use reductionposted by Lou Niles II on
Hello I am trying to get some guidance with regard to LEED v4 and outdoor sinks.
Sinks used in outdoor spaces for office buildings or campus , maybe for the BBQ gathering area.
Lead CxA Representative appointment; Delay causing concerns... Urgent solution required!
NC-v4 EAc1:Enhanced commissioningposted by Olawale Taiwo on
Background Consideration:
Does implementing MBCx remove the requirement for discrete OCx functional performance testing?
NC-v4 EAc1:Enhanced commissioningposted by Ilkka Mäkelä on
Hello,
If MBCx were to be implemented in a project, is the discrete functional performance testing and reporting part of OCx not required?
MBCx Plan as part of the Ongoing Cx Plan
NC-v4 EAc1:Enhanced commissioningposted by Francesco Passerini on
Can the MBCx Plan be presented as a part of the Ongoing Cx Plan?
Product Can Count for both EPD and Material Ingredients?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Yu Zhang on
I am working on a CI project that is going for both MRc3 and MRc5. If a product happen to have EPD and one of the certificates under Material Ingredients credit, can I count it towards the 20
Extended Producer Responsibility - Same Producer, Multiple Products
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Gillen on
I have several products that are specified for my project which are from the same manufacturer. For example, the same manufacturer makes the carpet and the laminate flooring.