Forum quick links
LEED User Concrete Tracking Form
NC-2009 MRc4:Recycled Contentposted by Melanie Blacklock on
Trying to use the LEED User Concrete Tracking Form for the first time to track fly ash. My question concerns Item I: Distances from both harvesting AND manufacturing point to project site (miles).
How to calculated for hybrid urinals
CI-2009 WEc1:Water Use Reductionposted by Susan Di Giulio on
Sloan has a new "hybrid" urinal that is basically waterless but does a pre-programmed, 1 gallon system flush every 72 hours. This solves a lot of maintenance and odor problems.
What if the project JUST uses only 1ea for each 20 EPD materials?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by J.W. Shin on
Hi,
What if the project JUST uses only 1ea for each 20 EPD materials?
Ready Mix Concrete
CS-2009 MRc5:Regional Materialsposted by Ann E on
Hi,
Regarding the mentioned subject, is there/ what papers/certification is needed to submit by the RMC Supplier regarding LEED?
Thank you.
Finding an auditor
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Joanne Sawatzky on
Hi,
Do any of you have a recommendation on where to find a 3rd-party APPA auditor? This is for a project in BC, Canada. Thanks in advance!
SJ
Vertical Expansion v. Horizontal Expansion
Healthcare-v4 MRc8:Design for flexibilityposted by Mary Couch on
Hello! I'm working on a project and we can only achieve Modular/Movable Casework, Vertical Expansion and Horizontal Expansion.
Shower for Large Unbuilt Out Retail in Mixed Use
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Michelle Rosenberger on
If we have a high rise residential tower with a large amount of retail/restaurant space that will be built out by future tenants, is there a way to address the shower requirement without putting it
Edit Approved Credit
CI-2009 PIf4:Schedule and Overview Documentsposted by Hana Altabbaa on
What are the consequences of re-opening an approved credit from early Design submittal to re-edit information for ex. update the project boundaries for the final design submittal ?
Commercial Toilets
CS-v4 WEp2:Indoor water use reductionposted by Michelle Rosenberger on
There is a very specific comment that eligible toilet fixtures only include tank style fixtures. Yet I see commercial style flush valve fixtures on the EPA WaterSense website.
Heat Island Reduction: Parking under Cover
Healthcare-v4 SSc5:Heat island reductionposted by Mary Couch on
I am on a project currently where we are pursuing option one of the Heat Island credit, we are curious as to whether we are able to pursue option B as well.