Topic | Recent |
---|---|
MERV 13 Filter for Inline Fresh Air Fan and Evaporative CoolerCS-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Oct 31, 2023, 1:44 am
. It appears that we are encountering a persistent issue in our projects. Many of our projects are situated in Non-Attainment areas, and we are already using ... Last reply: Afogreen Build, Apr 17, 2024, 9:00 pm |
|
Bird glazing that meets quality views credit requirementsNC-v4 EQc8: Quality Viewsposted by Blake Weaver on Dec 7, 2023, 10:01 am
I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing. Acid... Last reply: Afogreen Build, Apr 17, 2024, 8:57 pm |
|
Would a fire sprinkler system count as "other process water"NC-v4 WEc4: Water meteringposted by Cindy Quinn on Apr 16, 2024, 9:08 pm
Has anyone had success with a fire sprinkler system being one of the subsystems? Would it count as "other process water"? TIA! Last reply: Andrey Kuznetsov, Apr 17, 2024, 2:46 am |
|
Waste management plan submission with multiple GC'sNC-v4 MRp2: Construction and demolition waste management planningposted by Blake Weaver on Dec 21, 2023, 4:52 pm
I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different... Last reply: Afogreen Build, Apr 16, 2024, 9:00 pm |
|
No Cooling TowerCS-v4 WEc3: Cooling tower water useposted by Adriana Hansen on Jan 2, 2024, 11:46 am
Regarding the alternative compliance path to the LEED v4 credit Cooling tower water use (BD+C)<https://www.usgbc.org/node/2611780>, a... Last reply: Afogreen Build, Apr 16, 2024, 8:57 pm |
|
LTc Compact & ConnectedLEED v5 BD+C/ID+C: Location and Transportation Public Commentsposted by Emily Purcell on Apr 16, 2024, 2:07 pm
"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category." This language has posed a challenge for projects in v4/4.1... Last reply: Dave Hubka, Apr 16, 2024, 2:59 pm |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:45 pm
This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:39 pm
This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
EAc Reduce peak thermal loadsLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Emily Purcell on Apr 16, 2024, 12:26 pm
Very happy to see a heavily weighted credit breaking out thermal loads from the whole building energy model credit. This will be a great incentive not to ignore envelope even in buildings where... |
|
Number of eligible Innovation credits from Pilot CreditsNC-v4 INc1: Innovationposted by Jason Garvens on Jan 15, 2018, 12:00 pm
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? The way I read the requirements in the Innovation section it would appear to be up to... Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm |