Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EQ pilot credit 47 Acoustic Comfort

Homes-v4 EQp1:Ventilation
posted by  Maren Longhurst  on 

(Posting here because Pilot Credits weren't listed as an option.)

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Jan 16, 2019, 11:18 pm

Homes v4, EA, Home Size, positive and negative points?

Homes-v4 EAp4:Home size
posted by  Gary Wheeler  on 

On the Excel spreadsheet from LEED, there is no space to put either positive or netative points.

5
Default Avatar
Arch., LEED AP
LEEDuser Basic Member
0 thumbs up
Wed Jan 16, 2019, 10:42 pm
2
Wed Jan 16, 2019, 10:10 pm

Commercial Kitchen equipment commissioning

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Patrick Cellie  on 

I am working with a convention center currently certified Silver in the v2009 EBOM rating system. The owners are monitoring data with the goal to re-certify when the time comes.

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Wed Jan 16, 2019, 4:09 pm

Intumescent Paint and General Emission Evaluation requirements

NC-v4 EQc2:Low emitting materials
posted by  Michael Munn  on 

Do the General Emissions criteria for Paints and Coatings apply to intumescent flame retardants for structural elements? We've had difficulty finding products that meet (or report) compliance.

3
Default Avatar
Project Manager
Entuitive
LEEDuser Basic Member
19 thumbs up
Wed Jan 16, 2019, 12:41 am

Enhanced IAQ - EP for 2 strategies under Option 2?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Teresa Stern  on 

We are looking at installing CO2 monitoring at densely occupied spaces. We are also providing a dust collection system monitor and audible alarm at the firing range in a police station.

1
Tue Jan 15, 2019, 11:13 pm

Passing FSC credit to the End User

NC-2009 MRc7:Certified Wood
posted by  Bobby White  on 

Our company is working to obtain FSC certification. This is new to us so I'm trying to figure how to pass along the credit percentage.

2
Policy and Standards Manager - Chain of Custody
Forest Stewardship Council US
LEEDuser Expert
14 thumbs up
Tue Jan 15, 2019, 9:54 pm

case study / example for Radiant heating/cooling project in climate zone 4a?

Green Commons
posted by  Seonhee Kim  on 

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

4
Director of Sustainability
Design Collective
LEEDuser Basic Member
19 thumbs up
Tue Jan 15, 2019, 7:57 pm
4
Senior Director, Sustainability
Suffolk Construction
LEEDuser Basic Member
0 thumbs up
Tue Jan 15, 2019, 5:02 pm