Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Quality Transit - Distance

NC-v4 LTc5:Access to quality transit
posted by  Priya Venkat  on 

My project is located in a huge campus, and the distance to the main entrance of the campus is more than 800 m walking distance.

0

Can I recycle stones from excavation?

Schools-2009 MRc2:Construction Waste Management
posted by  Blanca Cespedes  on 

I understand that the intent of this credit is to divert construction and demolition debris from disposal in landfills and incineration facilities.

4
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Tue Feb 19, 2019, 2:39 am
1
Wed Mar 13, 2019, 1:56 am
1
Fri Dec 6, 2019, 12:54 pm

CI-2009 EAc1.3, Motor Variable Speed Control

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  David Schaeffer  on 

I am working on a tenant build out where all the equipment is existing, as part of the recent core and shell build.

1
Fri Mar 8, 2019, 4:58 pm

Campus Central Plant Thermal Storage Tanks

NC-v4 EAc4:Demand response
posted by  Thomas Vu  on 

We have a lab project on a university campus which is fed chilled water from their central chilled water plant.  The central plant also includes chilled water thermal storage tanks, which in e

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Feb 16, 2019, 4:28 pm

How to achieve controllability for an arena

NC-v4 EQc5:Thermal comfort
posted by  Helene Lefkowitz  on 

Hello - The project I am working on will have an arena and auction hall in the building. It is my understanding these spaces are considered a shared multioccupant space per LEED.

1
Fri Dec 20, 2019, 5:57 pm

No cooling tower Sweden

Pilot-Credits WEpc94:No Cooling Tower
posted by  Sandra Holmström  on 

We are pursuing this pilot credit as ACP for a Swedish Project.

1
Fri Jun 21, 2019, 9:12 am

Circulation of Fresh air via AHU

CI-v4 EQp1:Minimum indoor air quality performance
posted by  BEE Incorporations  on 

My project has 3 areas. Project AHU serves conditioned air to Area 1,2 and 3. The fresh air is supplied only to Area 1 directly from base building AHU due to constraints.

0