Baseline System Selection in LEED v4

NC-v4 EAp2:Minimum energy performance
posted by  Samer Hassanie  on 

This is in regards to Eap2 Minimum Energy Performance and Eac1 Optimized Energy Performance.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri May 10, 2019, 7:25 pm

Solar PPAs and Calculating Annual Energy Cost Reductions

NC-v4 EAc2:Optimize energy performance
posted by  Joshua Radoff  on 

All, I have a project that is looking to install a significant amount of solar PV on the roof of their commercial office project via a third party PPA arrangement.

13
Default Avatar
Energy & Sustainability Consultant
tk1sc
LEEDuser Basic Member
0 thumbs up
Fri May 10, 2019, 7:05 pm

Furniture Donations and Reuse

CI-2009 MRc2:Construction Waste Management
posted by  Kasey Kudamik  on 

We have a client that is building out a LEED-CI certified office space in a new location and will move from their current offices after the build out is complete.

4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri May 10, 2019, 4:56 pm

Attempting this Pilot as a Parksmart project Innovation

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Joanna Switzer  on 

Using the same approach I found successful on prior LEEDv4 projects (use of three Sherwin William's products with Manf prepared IABM compliance documentation), I am attempting to cross-reference an

1
Fri Oct 15, 2021, 1:50 pm

Gender neutral restrooms

NC-v4 WEp2:Indoor water use reduction
posted by  Anna Kaelin  on 

My project only has two water closets, one is back-of-house for employees only and one is for customers. Both are gender neutral.

1
Tue May 14, 2019, 5:00 am

Option 1 Requirements

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Yodi Danusastro  on 

Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C.

1
Wed May 15, 2019, 6:13 pm
4
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Thu May 9, 2019, 8:47 pm

Other Buildings within LEED Boundary

NC-v4 SSc5:Heat island reduction
posted by  Max Krueger  on 

Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified.

0

Reverberation Calculations for a Library - Option 2

Schools-NC-v4 EQp3:Minimum acoustic performance
posted by  Gwenedd Murray  on 

We have a library that is roughly 40,000cf which requires us to determine maximum reverberation from NRC-CNRC Construction Technology Update No.

1
Fri Oct 30, 2020, 9:21 pm