CI-v4 LTc3 - Access to quality transit - Question about "Bus Rapid Transit"
CI-v4 LTc3:Access to quality transitposted by Don Blair on
If a lane in a public street is signed with the wording "Bus Lane Ahead" and "Bus Lane" (those phrases are written on the pavement) but cars are not technically prohibited from&
IN vs. Exemp Performance Documentation Review
NC-v4 INc1:Innovationposted by Tracy Jordre on
We would like to wait until the Prelim Construction Submittal to submit our Innovation credits for review. In our preliminary design submittal, we did not mark the Innovation credit as “ready
Project with frits in some rooms
NC-v4 EQc7:Daylightposted by Danielle Waters on
For daylight credit, do the frits suffice as sun shading?
Or would these rooms of the building not qualify for the daylight credit or just be hindered during a simulation?
Solar Light Pipe simulation for option 1 method in LEED v4
NC-v4 EQc7:Daylightposted by Praveenbabu Rajkumar on
Hello,
DES allocation Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Dear All,
I have a question regarding LEED V2009 BD+C New Construction and Major Renovation, EA P2 - Minimum Energy Performance.
Missing inspection documentation
NC-v4 SSp1:Construction activity pollution preventionposted by Sean Adams on
Project has always been trying to earn LEED Silver and ESC plan was in place since beginning of construction but we have limited photo/inspection documentation.
Exhaust not interlocked with HVAC
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello, we have this residential project were the HVAC system is as follows:
Baseline: System 2 - PTHP
Proposed: Mini Split System
Construction Activity pollution prevention inspections
NC-v4 SSp1:Construction activity pollution preventionposted by Irene Carreno on
Hello. I am working in a project that has the Erosion and control plan following the CGP 2012(LEED V4) , part of the plan is to have weekly inspections on site to review how the erosion and control
Wet Applied Products Meeting Option 1- Volume Requirement?
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
For Wet Applied Products that meet IEQ credit 2, option 1: do you still need to provide the volume of the product used on the project, or is that just for option 2, Budget Calculation?