Commissioning of Existing Equipment

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jatuwat Varodompun  on 

We have a major renovation project which is 40% of gross area. Do we need to commissioning the equipment of existing equipment of the rest 60%.

1
Sun Aug 11, 2019, 9:37 pm

LEED ND v2009 Stage 2 vs Stage 3 (w/ v2009 sunsetting)

ND-v2009 PIf2:Project Timeline
posted by  Gwen Corrie  on 

Our LEED ND project registered under v2009 in 2015. Although we are currently registered under Stage 3, we still satisfy requirements under Stage 2.

7
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Sat Jul 20, 2019, 5:21 am
4
CPC, LEED AP BD+C
Durotech, Inc.
LEEDuser Basic Member
3 thumbs up
Fri Jul 19, 2019, 6:38 pm

Systems Narrative Template

EBOM-v4.1 EAp1:Energy Efficiency Best Management Practices
posted by  Ben McEwen  on 

Hi,

I'm wondering if I can use the same BAS System Narrative Template from V2009 for V4.1?

Thanks,

Ben

1
Sat Jul 20, 2019, 12:53 pm

HVAC Duct Sealant Requirements on LEED ® Projects

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Abdulrahman Sherazy  on 

the USGBC issued the following ruling: “Project teams may classify duct sealants under “Other”, as listed in the SCAQMD VOC Limits table.” The category of “Other” in the SCAQMD VOC Limits table ha

2
Sustainable Design Consultant
LEEDuser Basic Member
51 thumbs up
Fri Jul 19, 2019, 5:54 pm

Laundry processing: are there any defaults?

Hospitality-NC-v4 WEc2:Indoor water use reduction
posted by  Ricardo Sá  on 

Hi,

we are working on a project of a new hotel facility where owner do not have any estimation related with annual laundry process amount. 

1
Wed Oct 16, 2019, 3:55 am
1
Thu Sep 12, 2019, 5:45 pm