Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

option 2 - Is Land donation acceptable as alternate?

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Navisa Jain  on 

Hi,

Does land donated to a national entity for conservation qualify instead of financial support? 

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Mon Jul 29, 2019, 1:31 am

Smoking in Hotel Rooms in a Hospitality project

Hospitality-NC-v4 EQp2:Environmental Tobacco Smoke Control
posted by  shashank gangil  on 

We have been asked this question from a hotel who wants to go for LEED V4 Certification.

2
Principal
Integrative Sustainability Solutions
LEEDuser Premium Member
46 thumbs up
Mon Jul 29, 2019, 1:13 am

2 Issues

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  José Solis  on 

I have two issues related to this credit that I need clarification on. 1) I am trying to use this credit as an innovation credit for a LEED C&S v2009.

6
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Fri Jul 26, 2019, 8:38 pm

Documenting Similar Regularly Occupied Spaces

NC-v4 EQc8:Quality views
posted by  Heather DeGrella  on 

If the project we are working on has similar spaces (e.g.

3
Fri Jul 26, 2019, 3:49 pm

Central Plant Water Metering and Subsystems

NC-v4 WEc2:Indoor water use reduction
posted by  Craig Flandermeyer  on 

Our building is part of a campus with a central utility plant which delivers domestic hot and cold water (along with heating hot/cold water).  The best/only opportunity to meter process w

1
Thu Nov 14, 2019, 8:59 pm

CI v4.1 BPDO-EPD credit - Exemplary Performance point for 20 EPDs?

LEED v4.1 Discussion Forum
posted by  Renee Shirey  on 

For an NC/CI v4 project an Exemplary Performance point can be earned if the 20 EPD threshold is doubled to 40.  Substitution of CI v4.1 PDO-EPD credit drops the EPD count to 10.  So, if w

0

Quality Views in Non-Regularly Occupied Spaces Pilot

CI-v4 INc1:Innovation
posted by  Juliana Moreira  on 

We have submitted evidence for this credit for an open plan office project in London.

7
Thu Jul 25, 2019, 6:26 pm

REACH fulfillment to 1000 ppm / 100 ppm

NC-v4.1 MRc4:Material Ingredients
posted by  Alex Parella  on 

European paints manufacturer only justifies the fulfillment of REACH to 100 ppm, arguing that 1000 ppm level of analysis only suits with gas products.

1
Thu Aug 8, 2019, 2:44 am

Paint Storage

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Summer   on 

Does paint storage room is included in the requirement of interior-cross contamination prevention requirement?

2
Thu Jul 25, 2019, 9:00 am