Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
4
Sustainability Associate
Urban Fabrick, Inc.
LEEDuser Basic Member
7 thumbs up
Fri Aug 30, 2019, 6:41 pm

Historic Building Modeling for LEED

NC-v4 EAc2:Optimize energy performance
posted by  Sarah Gudeman  on 

Okay, have a dormitory building renovation project that includes the following:

3
Principal | Practice Lead
BranchPattern
LEEDuser Premium Member
6 thumbs up
Fri Aug 30, 2019, 3:46 pm

Can an outdoor mall entrance courtyard count towards the 30% open space requirement?

NC-v4 SSc3:Open space
posted by  B. Guzman  on 

Can an outdoor mall entrance courtyard count towards the 30% open space requirement, providing 25% of vegetated areas using planters and accomodating benches for outdoor social activities?

0

Sealant Tape Adhesive Volume?

NC-v4 EQc2:Low emitting materials
posted by  RDK E&S  on 

Forgive my ignorance here, but how does LEED v4 handle sealant tapes?

5
Thu Aug 29, 2019, 9:41 pm

Phase Change Materials

Green Commons
posted by  Becky Alexander  on 

I am getting started on a research project to evaluate the feasibility, costs, and benefits of using phase change material (PCM) to passively regulate temperature in Minnesota buildings.

3
Principal / Building Performance Practice Leader
Affiliated Engineers, Inc (AEI)
LEEDuser Basic Member
0 thumbs up
Thu Aug 29, 2019, 7:58 pm

Passive House training and certification

Green Commons
posted by  Margaret Montgomery  on 

I can see from the threads that there are at least a few Passive House advocates in this group - I'm wondering about the PHIUS training and certification.

14
Director of Sustainable Design
Vanderweil Engineers
LEEDuser Premium Member
0 thumbs up
Thu Aug 29, 2019, 5:33 pm

Fitwel v2.1 vs 2.0 Comparison Tool?

Green Commons
posted by  Harry Flamm  on 

Does anyone have a spreadsheet or chart that compares the new Fitwel v2.1 with Fitwel v2.0 ?

I can't seem to find such a thing on the Fitwel website.

2
Sustainability Specialist
Page
LEEDuser Basic Member
0 thumbs up
Thu Aug 29, 2019, 5:24 pm

Windows & Skylights required for feature #7?

Pilot-Credits EQpc78:Design for active occupants
posted by  RDK E&S  on 

Question is in reference to "7. Provide daylighting at each floor/roof level of the stair(s) using either windows and/or skylights of at least 8 square feet (1 square meter) in size.
 

2
Sustainability Design Leader, Exhibit Designer, Associate
CambridgeSeven
LEEDuser Premium Member
9 thumbs up
Thu Aug 29, 2019, 2:38 pm

Conference / Event Attendees: restroom usage rates

EBOM-v4 WEc2:Indoor water use reduction
posted by  Dan Ackerstein  on 

Does anyone have any vetted restroom usage rates for conference / event attendees?

1
Thu Aug 29, 2019, 12:56 pm