Forum quick links
Legal to cite LEED credits if not pursuing certification?
posted by Maria Papiez on
We are pursuing sustainability goals (and documentation of those goals) outside of any certification/rating system for a current project. However, we have set up a criteria list of goals by f
AHU Fan Power Requirement
CS-2009 EAp2:Minimum Energy Performanceposted by Summer on
I have a CS project in which the AHU will be provided by the tenant, since our energy modelling has been already simulated, we have no energy savings because of the missing information for the AHU
Servers, routers, switches
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Walker-Meere on
Hi, Would you clarify if routers and switches should be included in the list?
ASHRAE 209P - Energy Simulated Aided Design
posted by Jill Kurtz on
Does anyone have a draft copy of the ASHRAE 209P standard? It has not been finalized?
NC-2009 SSc5.1 - Site Development—Protect or Restore Habitat - VEGETATED AREAS
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Maria Peralta on
Hello!,
I have a doubt regarding to this credit.
Institute of Transportation Engineers’ Transportation Planning Handbook
Schools-NC-v4 LTc7:Reduced parking footprintposted by Kate Bubriski on
Does anyone know if the table in the 4th edition, which LEED v4.1 references, is different than the 3rd edition?
Submetering Process Water - Assisted Living laundry
NC-v4 WEc4:Water meteringposted by Jennifer Rennick on
I'm working on an assisted living facility that will have laundry machines in just a few of their residential units, but generally have a central laundry facility for the building.
Existing Building options...
posted by Rick Alfandre on
I am looking to confirm, for a client. For a building that was built in 2009, are there any avenues to LEED certification other than LEED EBOM?
LT CREDIT: ELECTRIC VEHICLES for Schools - Option 1 Electric Vehicle Charging
Schools-NC-v4.1 LTc8:Electric Vehiclesposted by Kimberly Lombardozzi on
The guide states that Option 1 for Schools Electric Vehicle Charging requires: