Forum quick links
Construction Final Review Accpetance
posted by Martin Stowell on
Hi All,
How to defined FTE number for project just only have conference, hall and meeting room?
NC-v4 WEp2:Indoor water use reductionposted by Tien Duong on
HI all,
Compliance when using design occupancy vs reference occupancy
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
2020 Sustainable MEP Leaders Summit - Save the Date!
posted by RoseAnn Grimes on
Mark your calendars Sustainable MEP Leaders!!
Here are the details to save the date for the 2020 MEP Summit:
Economizer for VRF and other systems as per ASHRAE 90.1-2010 requirement
NC-v4 EAc2:Optimize energy performanceposted by Micaela Smulevich on
when working With Roof Tops machines and commercial split system or water chiller with air handling units I consider the economizer is required as per ASHRAE section 6.5.1, is this correct?&nb
Core and Shell Project - "Must use reasonable LEED boundaries"
CS-v4 MPR2:Must use reasonable LEED boundariesposted by JUAN FELIPE BARBOT GIORDANO on
Dear all,
car workshop = retail?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Benjamin Weise on
Hello,
is a car workshop to be certified under the "retail" version of LEED v4?
Thanks in advance!
Using Credits from Rating System Other than LEED as ID Credits
NC-v4 INc1:Innovationposted by Kathleen Gaffney on
I tried to find whether or not this question had been asked on the LEED v3 or LEED v4 comment thread but nothing seemed to rise to the surface.
Site with a mix of developed and undeveloped areas
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Dear All,
Option 1 requires on-site management of the runoff from the developed site for the 95th or 98th percentile of local rainfall events.
Difference between Reference Guides of BD+C and ID+C
posted by Thomas Tran on
Dear All,