Forum quick links
Sports Field Lighting (Flood lights)
NC-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
I am working on Football Club Academy project based on LEED NC 2009 and AGMBC 2011.
Shading by trees
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Courtney Royal on
Hello, I have never documented this credit by using the shading option from existing tree canopy. I understand you'll need to calculate shaded area from each tree on June 21 at 10, 12, and 3pm.
Overhead Vegetated Canopy
NC-v4 SSc3:Open spaceposted by Nita Christopher on
We have a campus site site with areas, outside of construction limits, that contain many mature shade trees with turf grass underneath.
Tree canopy
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Carolina Vergnano on
We are using the shadow of the trees canopy to comply with the credit. When calculating the average shadow of three times a day, part of this is outside the site boundary.
LT 6 Bicycle Longterm and Shortterm v4 or v4.1 indoors?
NC-v4.1 LTc6:Bicycle Facilitiesposted by sandra DOLD on
PLease confirm if we upgrade to LEED v4.1 there is no requirement for indoor bike storage facilities for either long or short term biking. My understanding the shorterm needs to be within 100
Roof under Woven Shading Layer
NC-v4 SSc5:Heat island reductionposted by Senna Sabir on
Hi everyone
Min outside air requirements for unoccupied spaces/buildings - energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi all,
We have an unoccupied building (sub station) that has corridors, toilet etc for very occasional maintenance occupancy.
Energy Simulation: naturally ventilated and conditionated (No HVAC)
NC-v4 EAp2:Minimum energy performanceposted by Jose Antonio Kovacevic on
We are pursuing LEED V4 NC Certification for a building that is part of a University Campus.
Public Transportation subsidy?
NC-v4 LTc5:Access to quality transitposted by Erin Holdenried on
Reduced Parking and Green Vehicles offer credit for 20% discount in place of preferred parking. Has anybody tried a similar ACP approach for this credit? To get some credit, such a
Bicicles facilities for an existing building
CS-v4 LTc6:Bicycle facilitiesposted by Marion THIBAULT on
Dear all LEED users,