Topic | Recent |
---|---|
MR Credit: Optimized Building ProductsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Carrie Havey on May 24, 2024, 2:42 pm
BIFMA e3 / level - It’s not clear why Social Health & Equity is not included here. BIFMA level includes three prerequisites for Social Impacts: 8.1.1 Employee Health and Safety Management, 8... |
|
Mandate bicycle or pedestrian usage to reduce the extraction of natural resourceLEED v5 BD+C/ID+C: Location and Transportation Public Commentsposted by THAMARAI SELVI.M on May 24, 2024, 2:02 pm
When we encourage to use electric vehicle we also need to consider that most battery are also naturally sourced material like lithium. Though we have credits associated to bicycle and walkscore... |
|
LEED v5 BD+C/ID+C: Indoor Environmental Quality public commentsLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Nadav Malin on Apr 2, 2024, 5:06 pm
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Indoor Environmental Quality section on this forum. You can either reply to this thread or use the "Post a Question... Last reply: Jodie Thill, May 24, 2024, 1:52 pm |
|
EAp: Fundamental CommissioningLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Christopher DeJulis on May 24, 2024, 1:41 pm
ASHRAE Standard 90.1 4.2.5.1 requires that the building envelope undergoes |
|
IP category commentsLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by Emily Purcell on Apr 30, 2024, 9:50 am
Compiling a few people's comments here... Social equity assessment: It seems like the credit language for NC is repeated for CI and CS. How can these... Last reply: Christopher DeJulis, May 24, 2024, 1:36 pm |
|
LEED v5 BD+C/ID+C Materials and Resources public commentsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:25 am
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Materials and Resources category on this forum. You can reply to this thread or use the "Post a Question or Comment... Last reply: Jodie Thill, May 24, 2024, 1:31 pm |
|
IDC Assess and Reduce Embodied CarbonLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Nadav Malin on May 24, 2024, 1:04 pm
The ID+C credit Assess and Reduce Embodied Carbon, Option 2: It's unclear what are the referenced Paths 1, 2 and 3 for this credit. I also don't understand how Options 1 and 2 interact,... |
|
LEED v5 BD+C/ID+C Sustainable Sites public commentsLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:22 am
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Sustainable Sites category on this forum. You can reply to this thread or use the "Post a Question or Comment"... Last reply: Jodie Thill, May 24, 2024, 12:59 pm |
|
LEED O&M Starter Kit and Pilot Credit Safety First: Cleaning and Disinfecting Your SpaceNC-v4 INc1: Innovationposted by James Keohane on Jul 7, 2021, 1:24 pm
Is it acceptable to for a LEED v4 BD+C: NC project to seek BOTH innovation point for LEED O&M Starter Kit and a Pilot Credit INPC 137- Safety First: Cleaning and Disinfecting Your Space??... Last reply: Michelle Cordero, May 24, 2024, 12:48 pm |
|
MR Credit: Waste PerformanceLEED v5 O&M Existing Buildings Public Commentsposted by Anna Dengler on May 24, 2024, 12:26 pm
A couple suggestions: There should be an option to qualify for 9 points (or the full number of points, if not 9) by completing TRUE Certification (at any level) since the certification requires... Last reply: Anna Dengler, May 24, 2024, 12:28 pm |