Forum quick links
Material Ingredient Screening/Action Plan
NC-v4.1 MRc4:Material Ingredientsposted by Brianne Grace on
I'm grasping for one last point here.
Modeling Occupancy Sensors for lighting
NC-v4.1 EAp2:Minimum Energy Performanceposted by Saif Alsaeed on
I am working on a 90.1-2016 App G energy model. The schedules in ASHRAE 90.1 User’s Manual indicates that the lighting schedule reflects mandatory occupancy sensors requirements of section 9.4.
Grass area may become a future parking lot.
NC-v4.1 WEp1:Outdoor Water Use Reductionposted by Don Wheeler on
When determining baseline calculations, I know not to include any aggregate areas.
ENERGY STAR Appliances & Equipment Required for Federal Project
CI-v4 EAp2:Minimum energy performanceposted by David Hryvniak on
We are working on a project that is owned by the Federal Government. By law, all newly purchased equipment that is eligible must be ENERGY STAR certified.
Source for Table 1 Maximum Parameters
posted by indian tantrik on
Source for Table 1 Maximum Parameters
Source for Table 1 Maximum Parameters
NC-v4 WEc3:Cooling tower water useposted by Nathan Gauthier on
Does anybody know where USGBC / WE TAG came up with Table 1? I've not been able to find it anywhere, except where it is referenced as coming from LEED.
0.5 PPB above threshold
NC-v4 EQc4:Indoor air quality assessmentposted by Omar Elrawy on
Dear all,
Our IAQ test results show compliance for all parameters except for Fromaldehyde, which is 27.50 PPB , meaning that it is only 0.50 PPB above the threshold.
Marquee sign to be provided at a later time
NC-v4 SSc6:Light pollution reductionposted by Tacy Austin on
The marquee sign is shown on our site plans but the intention is to install at a later date. To receive this credit, what is the best way to document this?
How to calculate "Area with Direct Line of Sight to the Outdoors via Vision Glazing" without a 90 degree angle?
NC-v4 EQc8:Quality viewsposted by Elissa Wu on
I am working on a project that has two regularly occupied spaces that do NOT have two 90 degree apart windows. I am instead going for Type 2 and Type 4.
Job Descriptions?
posted by Laura Soma on
I've been researching the job description for "Director of Sustainability" and Sustainability Director" as I'm at a point where Sustainability Specialist no longer seems to fit. If you have e