Forum quick links
Drawing the 1/2 Mile Radius for Community Connectivity Credit
NC-2009 SSc2:Development Density and Community Connectivityposted by Joshua Bloom on
I am trying to plot out the 10 community connectivity locations using either google maps or bing maps, and I am unable to draw a 1/2 mile radius circle to enclose the area.
acrylic textured coating
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Dario Ibarguengoitia on
How would I clasify an acrylic textured coating? Thank you very much!!!!
EAC1 Credit Information
NC-2009 EAc1:Optimize Energy Performanceposted by Sari Kujawa on
Under the credit information website with "Credits, Credit Details, Points, Thresholds" listed. The Path is noted as "12% new/8% existing (1 pt) while our template form notes 10 points documented.
ASHRAE 90.1 APPENDIX G Existing Building Model including shading
CS-2009 EAp2:Minimum Energy Performanceposted by Fabiano Castro on
We are modelling a Major Renovation Project under the ASHRAE 90.1-2007 - APPENDIX G.
Submit in Design review but include manuf. cuts in Const Review
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Renee Shirey on
The prereq requires manufacturer cut sheets for the accoustic materials.
Simplified Approach
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Jean Marais on
I have a kindergarten, 7440sf, ground level only, all learning spaces are on perimeter with windows. There is only a small road on the one side about 20 m away.
synergies from LEED-NC to LEED-EBOM
posted by Tristan Roberts on
Jeff, I think you will find the client is starting from scratch.
LEED for Retail: CI
CI-2009 SSc2:Development Density and Community Connectivityposted by Kory Beighle on
I am working on a Retail:CI project and we are attempting the documentation for the SSc2 Option 2.