Forum quick links
Performance Period Clarification
posted by Michelle Bracewell-Musson on
I have read quite a bit about the Performance Period and I want to be sure I am understanding things correctly.
SF6 in MV switchgears - Any LEED limits?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Werner Sobek on
Does the SF6 (Sulphur Hexafluoride) insulating gas used to quench the arc in electrical power equipment (MV switchgears) need to be taken into consideration under the EAc4?
Site contamination
Schools-2009 SSp2:Environmental Site Assessmentposted by Carol Vick on
I have a LEED for Schools project where we have site contamination from an old gas station leaky storage tank.
MERV 13 filters on fan coil units
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by james moler, p.e. on
Numerous CIR responses and LEED Interpretations previously denied the credit where fan coil units recirculating room air for supplemental cooling in high load spaces were equipped with MERV 8 filte
non-finished flooring for C&S
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Natalie Ng on
the project is an office building development, the project proponent would like to leave the feasiblity of installing carpet to the tenants thus the floor will be concrete finish with raised floor
Babies - Water Consumption
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Adriana Hansen on
I'm working on a preschool project, which will have 30 babies between 4 months to 1 year-old; 30 babies between 1 to 2 years-old; 30 babies between 2 - 3 years-old; and 30 babies between 3 to 4 yea
Rubber Walk-Off Mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Dave Wortman on
We are contemplating the use of a rubber walk-off mat for a high traffic area at a winter resort with lots of snow.
Energy Efficiency Verification (EEV) vs Energy Star
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Monika Mickute on
Hi, We purchased a Kenmore Refrigerator for our new office, which is pursuing LEED CI, and instead of it having an Energy Star sticker, it says it is EEV Rated.
New PI Form 2 Version 4.0
posted by Ross Spiegel on
I am working with the latest version of PI Form 2 on a project and it includes several new lines to complete.
Appeal Process - Submitting all credits at once ?
posted by Maya Karkour on
Dear all, Do any of you know if we are supposed to submit all the appeals at once ? or can we submit them gradually ? Thank you for your help,