Performance Period Clarification

Performance Period
posted by  Michelle Bracewell-Musson  on 

I have read quite a bit about the Performance Period and I want to be sure I am understanding things correctly.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Feb 19, 2012, 1:24 am

SF6 in MV switchgears - Any LEED limits?

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Werner Sobek  on 

Does the SF6 (Sulphur Hexafluoride) insulating gas used to quench the arc in electrical power equipment (MV switchgears) need to be taken into consideration under the EAc4?

3
Default Avatar
Environmental Engineer - Certification
Skanska Sverige AB
LEEDuser Basic Member
94 thumbs up
Sat Feb 18, 2012, 5:28 am

Site contamination

Schools-2009 SSp2:Environmental Site Assessment
posted by  Carol Vick  on 

I have a LEED for Schools project where we have site contamination from an old gas station leaky storage tank.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Feb 18, 2012, 3:17 am

MERV 13 filters on fan coil units

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  james moler, p.e.  on 

Numerous CIR responses and LEED Interpretations previously denied the credit where fan coil units recirculating room air for supplemental cooling in high load spaces were equipped with MERV 8 filte

4
Sat Feb 18, 2012, 1:08 am

non-finished flooring for C&S

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Natalie Ng  on 

the project is an office building development, the project proponent would like to leave the feasiblity of installing carpet to the tenants thus the floor will be concrete finish with raised floor

7
Default Avatar
Owner
Gaia Development
LEEDuser Basic Member
5 thumbs up
Sat Feb 18, 2012, 12:12 am

Babies - Water Consumption

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Adriana Hansen  on 

I'm working on a preschool project, which will have 30 babies between 4 months to 1 year-old; 30 babies between 1 to 2 years-old; 30 babies between 2 - 3 years-old; and 30 babies between 3 to 4 yea

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Fri Feb 17, 2012, 7:38 pm

Rubber Walk-Off Mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Dave Wortman  on 

We are contemplating the use of a rubber walk-off mat for a high traffic area at a winter resort with lots of snow.

3
Fri Feb 17, 2012, 6:37 pm

Energy Efficiency Verification (EEV) vs Energy Star

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Monika Mickute  on 

Hi, We purchased a Kenmore Refrigerator for our new office, which is pursuing LEED CI, and instead of it having an Energy Star sticker, it says it is EEV Rated.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 17, 2012, 6:23 pm

New PI Form 2 Version 4.0

General forums
posted by  Ross Spiegel  on 

I am working with the latest version of PI Form 2 on a project and it includes several new lines to complete.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Feb 17, 2012, 5:33 pm

Appeal Process - Submitting all credits at once ?

LEED for Homes (LEED-H) Forum
posted by  Maya Karkour  on 

Dear all, Do any of you know if we are supposed to submit all the appeals at once ? or can we submit them gradually ? Thank you for your help,