Residential Bath Lavs
NC-2009 WEc3:Water Use Reductionposted by Jeremy Kuhre on
Does anyone have experience with using a 1 gpm aerator in a residential setting? We typically use 0.5 gpm aerators in commercial settings which has worked fine.
Avoidance of Chemicals of Concern Credit
posted by Anne Less on
Yikes! I spy what I hope is a MAJOR typo in this credit language.
Prerequisites in Master Site
posted by Omer Moltay on
We are using the campus approach for a mixed used development. None of the prerequisites will be applied under the master site.
Health Faucet
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Green BSL on
Hellow, Shall we consider Health Faucet provided in restroom for LEED CI Calculation in WEp1.0 & WEc1.0?
Building Envelope Compliance
CI-2009 EAp2:Minimum Energy Performanceposted by Omar Delgado on
Greetings, We're doing a CI project where the glazing far surpasses the 40% wall area allowed on the north wall. However, the envelope will not be altered for this project.
Entry Way Systems: Floor mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Elle Brown on
I am working on a government project and half of our building is a garage space. 1. Do we have to put 10 ft long floor mats at each exterior door to the garage?
manufacturing plant: group certification or single structure?
posted by Jutta Berns on
i probably know the answer already, but i just want to test my understanding: we are in the process of registering a manufacturing plant (BD+C), which consists of an office building and a manufac
Energy Star Equipment and Timing
CI-2009 EAp2:Minimum Energy Performanceposted by Curt Pascoe on
I'm bringing up a topic discussed but not solved in previous comments. What does the USGBC include in "equipment installed as part of the tenant's scope of work"?
Defer Credits
posted by Emily Catacchio on
Dana,
I recently recieved this response from GBCI:
Defining usage groups for tenant scope fixtures.
CS-2009 WEp1:Water Use Reductionposted by Luis Miguel Diazgranados on
Hi everyone, I'm working on an office building in which efficient bathrooms will be installed as part of the Core and Shell scope.