Defer After Initial Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Breana Detzler  on 

We recently received comments on our initial design review submission.

6
Default Avatar
Project Designer
Risinger + Associates
LEEDuser Basic Member
39 thumbs up
Wed Mar 21, 2012, 12:55 pm

initiation of the review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Alicja Bieszyńska  on 

We have finished uploading all the documentation for the Design Submittal and marked all credits "Completed".

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Mar 21, 2012, 6:19 am

FSC Wood is good, but NOT the ONLY one!

General forums
posted by  Ward Miller  on 

The battle in the U.S.

4
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Tue Mar 20, 2012, 9:22 pm

Template issues for Option 1

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  renee jimenez  on 

Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Tue Mar 20, 2012, 9:03 pm

A credit that's not in a category?

General forums
posted by  Nadav Malin  on 

Is anyone else concerned about the structure of this draft, in that the Integrative Process credit is floating off by itself, outside of any category?

3
Default Avatar
Senior Project Manager
CodeGreen Solutions
LEEDuser Basic Member
157 thumbs up
Tue Mar 20, 2012, 8:55 pm

Public Metering/Autocontrol Lavatory Faucet – Gallons per Cycle

General forums
posted by  Jeremy Cressman  on 

It appears that the metering faucet calculation providing a Gallons per Cycle option for flow rate has been removed from LEED 2012 Water efficiency prerequisite and Indoor water use calculation. I

4
Default Avatar
Senior Project Manager
CodeGreen Solutions
LEEDuser Basic Member
157 thumbs up
Tue Mar 20, 2012, 8:46 pm

Alternative Commuting

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Aron Weis  on 

Does the fact that 80% of the people in the building I am evaluating for LEED-EB have FlexFuel cars help? Even if they do not use FlexFuel (Ethanol 85)?

10
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Tue Mar 20, 2012, 7:08 pm

Sample of Measurement and Verification report for Option B?

NC-2009 EAc5:Measurement and Verification
posted by  Eric JS   on 

Dear all, Do you have any sample of Measurement and Verifiation report for Option B? Thank you and cheers!

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Tue Mar 20, 2012, 7:04 pm

Core Performance Guide Requirements for Efficiency

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Erik Dyrr  on 

To earn 5 points using Option 1: Equipment Efficiency, systems must comply with the efficiency requirements outlined in the Core Performance Guide.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 20, 2012, 6:17 pm

Energy simulation

CI-2009 EAp2:Minimum Energy Performance
posted by  Pongthon Junnapat  on 

For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work Thanks in advance

5
Tue Mar 20, 2012, 1:28 pm