Forum quick links
Defer After Initial Design Review
posted by Breana Detzler on
We recently received comments on our initial design review submission.
initiation of the review
posted by Alicja Bieszyńska on
We have finished uploading all the documentation for the Design Submittal and marked all credits "Completed".
FSC Wood is good, but NOT the ONLY one!
posted by Ward Miller on
The battle in the U.S.
Template issues for Option 1
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by renee jimenez on
Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f
A credit that's not in a category?
posted by Nadav Malin on
Is anyone else concerned about the structure of this draft, in that the Integrative Process credit is floating off by itself, outside of any category?
Public Metering/Autocontrol Lavatory Faucet – Gallons per Cycle
posted by Jeremy Cressman on
It appears that the metering faucet calculation providing a Gallons per Cycle option for flow rate has been removed from LEED 2012 Water efficiency prerequisite and Indoor water use calculation. I
Alternative Commuting
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Aron Weis on
Does the fact that 80% of the people in the building I am evaluating for LEED-EB have FlexFuel cars help? Even if they do not use FlexFuel (Ethanol 85)?
Sample of Measurement and Verification report for Option B?
NC-2009 EAc5:Measurement and Verificationposted by Eric JS on
Dear all, Do you have any sample of Measurement and Verifiation report for Option B? Thank you and cheers!
Core Performance Guide Requirements for Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Erik Dyrr on
To earn 5 points using Option 1: Equipment Efficiency, systems must comply with the efficiency requirements outlined in the Core Performance Guide.
Energy simulation
CI-2009 EAp2:Minimum Energy Performanceposted by Pongthon Junnapat on
For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work Thanks in advance