Forum quick links
RESPONSIBLE EXTRACTION OF RAW MATERIALS
posted by Susann Geithner on
Distance in US vs Europe If a product meets the requirements for a responsible extracted raw material it will be weighted also by distance to the location in the way of being extracted within the
Ventilation rate in garage with local code
NC-2009 IEQp1:Minimum IAQ Performanceposted by Daniel Strömberg on
Dear All, I have a further question about the ventilation rate. I am currently in a LEED project in Europe, which has a garage in the building.
Window Film Adhesive
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jessica Aubert on
We are working on a CI project which is bounded on three sides by a glass atrium space.
LEED certification for factories
posted by Mike Barker on
Rosamaria, in my humble opnion the key to it all is the intergration of the M&V plan and the energy modelling. You can use IPMVP to build baselines for anything.
Commissioning of Systems not required in prereq
NC-2009 EAc3:Enhanced Commissioningposted by Shauna Sproul on
Can points be achieved in innovation and design for commissioning of systems not required in prereq, for example the building envelope? I understand 2012 is addressing this, but what about 2009? I
CxA designation question
NC-2009 EAc3:Enhanced Commissioningposted by Blas Beristain on
Hello! We are involved in a project of a new headquarters of an architectural firm. In this project, the owner will be the architectural firm.
CxA Contract Question
NC-2009 EAc3:Enhanced Commissioningposted by Mark Haynie on
We hold a contract for construction of a project as the General Contractor. We also have contracted with the design firm (Architect) for the project.
Round-up
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by SIG - Sustainability Main Account on
I'd like to confirm that Round-Up Pro (EPA # 524-475) is okay to use for weed control in sidewalk cracks.
LEED 2012 Should Be 2014
posted by Gary Shlifer MS, LEED AP BD+C, Homes on
I am an advocate for raising the bar. However, significant market buy-in has not occured. We need to stay at LEED 2009 levels for more than just 2 years. It should be more like 5.