Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SSc2: Sidewalk connectivity between services

NC-2009 SSc2:Development Density and Community Connectivity
posted by  john davi  on 

I'm working on a suburban site that has over ten services within the the 1/2 mile radius, but there is not a sidewalk connecting them.

3
Architect
FARR
LEEDuser Basic Member
2 thumbs up
Fri Apr 6, 2012, 2:20 pm

Central daylight control applicable?

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Marco Abdallah  on 

Hello, there are also systems on the market which measure the daylight amount at a central weather station on the roof of the building and then calculate the shadow and control each lamp with a sof

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Fri Apr 6, 2012, 1:23 am

Food Waste Diversion

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Alexa Stone  on 

Hi All, I was surprised not to find this in a previous post but I'm glad im bringing it up as it is getting to be a popular item.

3
Thu Apr 5, 2012, 10:01 pm

COLD FLUID-APPLIED WATERPROOFING RUBBER MEMBRANE

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Ibrahim El-Shair  on 

What is the VOC limit for COLD FLUID-APPLIED WATERPROOFING RUBBER MEMBRANE which is used under ceramic or in kitchen/bathrooms??

4
Partner, Architecture & Sustainability
DIALOG
LEEDuser Premium Member
449 thumbs up
Thu Apr 5, 2012, 7:20 pm

Cork Bulletin Boards and Marker Boards

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Abena Darden  on 

Does anyone know if cork bulletin boards or marker boards typically have urea formaldehyde resins?

2
Technical Information & Public Affairs Manager
UL Environment
LEEDuser Basic Member
356 thumbs up
Thu Apr 5, 2012, 6:02 pm

Achieving IEQc1 with no ventilation as part of C&S project

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Tony Schafer  on 

Can this credit be achieved if there will be no ventilation as part of the C&S project?

3
Thu Apr 5, 2012, 5:45 pm

Relocating Furniture

CI-2009 MRc5:Regional Materials
posted by  Sheela I  on 

Hello, I am working on a LEED CI project and we are reusing most of the furniture at the new office location. The distance between new and the previous office is with in 500 miles.

3
Thu Apr 5, 2012, 2:41 pm

Negative Pressure Differential Requirement

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maya Karkour  on 

Dear all, One of the credit requirements is that: "The pressure differential with the surrounding spaces must be at least 5 Pa on average and 1 Pa at a minimum when the doors to the rooms are clos

2
Director of Intersectional Professional Services
LEEDuser Basic Member
41 thumbs up
Wed Apr 4, 2012, 8:23 pm
5
Wed Apr 4, 2012, 6:06 pm

Does a crisis center require covered storage for bikes?

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Megan Dougherty  on 

Our project is a crisis center which provides drop-in services and short term residential services. The drop in portion is considered an institutional project.

2
Default Avatar
Sustainability Coordinator
Dougherty + Dougherty Architects
LEEDuser Basic Member
1 thumbs up
Wed Apr 4, 2012, 5:46 pm