Forum quick links
New addenda
posted by Emil Andersson on
April 2012 addenda issued for LEED HC: http://www.usgbc.org/DisplayPage.aspx?CMSPageID=2200#BD+C
Leveling Compounds
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Bruce Maine on
Has anyone experienced reviewers comments on Leveling Compounds or is the application more geared towards flooring systems?
Qualifies for SSc7.1 and SSc7.2--Double Dipping?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Brooks Critchfield on
The grade at our project drops considerably, allowing for conditioned space below a green roof and paved areas.
Exhaust air energy recovery in the baseline
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, my question is: when do i have to consider the exhaust air energy recovery in the baseline building’s AHU? The 90.1 User’s manual reports that exhaust air Energy recovery is required for
Simulation Clarification
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Rebekah Burke on
We are being challenged by the modification to IEQc8.1 Option 1 Simulation from May 9th, 2011, which replaced the entire section.
Labs21 Benchmarking Tool
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Guilherme Ramos on
Does anybody know what's LEED position about laboratories benchmarking using this tool? I'm working on a lab certification project (EBOM) and since our lab ratio is more than 10% of our gross area,
ASHRAE 90.1 does not apply to portions of Building
NC-2009 EAp2:Minimum Energy Performanceposted by Kai Andrade on
A portion of our new building will be dedicated to maintenance of large vehicles (large trucks, earth movers, etc) and is priimarily industrial in nature.
Carpeting Seam Cleaners
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Bruce Maine on
I'm familiar with seam sealers that can comply with IEQ c4.1 but I have a submittal for a "seam cleaner" where the VOC content is far beyond anything SCAQMD references.
What are my options
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Matthew VanSweden on
Say, strictly hypothetically of course, that I have a CI project that is complete with minimal HVAC systems in it's scope.