Light trespass to a "welcoming neighbor"NC-v4 SSc6: Light Pollution Reductionposted by John Mlade on Nov 7, 2024, 10:08 am
Hi all, hoping you can provide some insight into this scenario. We are redeveloping a heavy industry site in an urban setting into a logistics warehouse building. Our... Last reply: Dave Hubka, Nov 7, 2024, 1:46 pm |
|
Additional i-Tree Tools and SupportPilot-Credits SSpc158: Onsite Carbon Sequestration Through Plantingsposted by Kristi Ennis on Nov 7, 2024, 3:17 pm
After documenting this credit, we discovered that i-Tree offers additional support, calculators and design tools on thier website which are bypassed if you use the web address listed in the pilot... |
|
Regarding the results of the DES Large-scale calculatorRetail-CI-v4 EAc2: Optimize Energy Performanceposted by on Nov 7, 2024, 9:45 pm
Dear all, I understand that “Optimize energy performance” in LEED v4 updated in 2024 is awarded as the sum points for energy use or energy cost emissions and greenhouse gas emissions.... |
|
Errors in v4.1 MEPC Excel SheetNC-v4.1 EAp2: Minimum Energy Performanceposted by Junaid Mujahid on Oct 28, 2024, 2:22 am
What is the best way to resolve errors with the v4.1 MEPC? The "Quality Assurance Checks" tab is reporting values which are inconsistent with the "Performance Outputs" tab due to which other... Last reply: Tyler Thumma, Nov 8, 2024, 8:18 am |
|
Baseline and Proposed System for LEED ID+CNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Nov 4, 2024, 12:00 pm
Hi I am working on a LEED ID+C project for a building that was built in 1970s with 60% WWR, now the struggle here is the Existing system is Dual Duct... Last reply: Tyler Thumma, Nov 8, 2024, 8:24 am |
|
Designated Smoking areas inside the buildingEBOM-v4 EQp2: Environmental tobacco smoke controlposted by Amal Venugopal on Sep 3, 2020, 8:16 am
Hi , I m looking for a clarification on alternative compliance path for complying the prerequisite Environmental Tobacco Smoke Control under LEED v4 O M rating system. The project is a high rise... Last reply: sahar elfaki, Nov 10, 2024, 1:08 am |
|
How to Model Proposed and Baseline HVAC system for a District level heating and Cooling systemNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm
Hi, I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a... Last reply: Manuel Romera Molina, Nov 11, 2024, 2:53 am |
|
LEED v4.1 Service water-heating system with DES purchased heatHospitality-NC-v4.1 EAp2: Minimum Energy Performanceposted by Manuel Romera Molina on Nov 11, 2024, 4:01 am
Hello everybody, Regarding the Baseline Service Water-Heating System, both Table G3.1.1-2 in Standard 90.1 - 2016, as well as the statements in Table 3 "Changes in ASHRAE 90.1 Performance... |
|
Do Daylight and Views Credits Require the Same Regularly Occupied Space?Warehouses-NC-v4 EQc7: Daylightposted by Alefiya Bhiwandiwala on Nov 12, 2024, 2:41 am
I have a question about a project with a core production/... |
|
regularly occupied areasNC-2009 IEQc8.2: Daylight and views - viewsposted by Ed Clark on May 9, 2011, 1:39 pm
I am trying to confirm what is considered a regularly occupied area: copy room? Last reply: Alefiya Bhiwandiwala, Nov 12, 2024, 3:03 am |