Forum quick links
White polyethylene SRI
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Guillermo T. Adamo on
Hi, We are pursuing the credit by covering 50% of the parking places with a white polyethylene shade cloth of 70% density.
Timing of IAQ testing compliance
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anders Olson on
I am part of a LEED NC 2009 for Retail project that intends to pursue Option 2 -- Air Quality Testing -- for this credit.
Flushout calcs for Option 1 Path 1
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Mark Haynie on
To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)?
EAc1 ASHRAE 90.1-2007 Energy Simulation Model
NC-2009 EAc1:Optimize Energy Performanceposted by Denise Newbould on
Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed?
Prerequisite at risk!
posted by Alicja Bieszyńska on
We have just received the Preliminary Design Submittal Review for our project.
IEQp1 - Occupant diversity
NC-2009 IEQp1:Minimum IAQ Performanceposted by susan eguia on
Hi, We have existing Library project with combined multiple zone and single zone.
Duct Work
CI-2009 MRc3.1:Materials Reuseposted by Holly Himes on
I think I know the answer, but can duct work be counted towards material re-use?
HELP - Do I have to follow AGMBC?
posted by Dhanujie Jayapala on
Hi, We are doing a project to develop a manufaturing faciltiy for our company.
Why IEQc5 Applies to Entire Building?
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Andrew Gil on
No disputing that the requirements of IEQc5 are both sensible and valuable,, so much so that our firm now incorporates these provisions in ALL projects, regardless of LEED certification intent.
LEED certification in China
posted by Tristan Roberts on
Biao, welcome to the LEEDuser forum!