FAQs about EAp2 :

We have installed submeters on our building but the utility bill includes energy use from several other buildings located on the same campus. How do we reconcile this during the LEED review process?

When is it possible to exclude up to 10% of the building from EAp2?

What do I do if the number of building occupants, operating hours, or vacant space changes during the performance period?

If you pursue the streamlined path for an Energy Star label, should the performance period for EAc6 match the 12-month time frame of the label?

How do I account for computers with multiple monitors on Portfolio Manager?

How should I treat vacant space on Portfolio Manager?

Our building includes a large laboratory space. Can our project benchmark under the Labs21 program?

We have an international project and the space type is eligible for an Energy Star rating. Can we pursue Case 1 to demonstrate compliance given the recently released alternative compliance paths for international projects?

We have a number of buildings on a single campus that we would like to certify at the same time. Is it possible to benchmark the buildings at the campus level?

I have a mixed-use building and am wondering if it is possible to pursue the prerequisite through Case 1. How do we proceed?

We have a building that consists of two attached structures and it’s unclear if we have to consider it a single building or if it should be certified as two separate buildings and benchmarked accordingly. How should we proceed?

How long is an Energy Star label valid to use with a streamlined approach for Case 1?

Our building includes heavy process loads that significantly increase the overall energy use in the building. If we submeter these loads, can we exclude this energy use for benchmarking purposes?

View answers »

Forum discussion

EBOM-2009 EAp2:Minimum Energy Efficiency Performance

Manufacturing Plant

My client operates a prosthetics manufacturing plant. There is no benchmark in ENERGY STAR for this kind of facility. I know it will not be eligible for an ENERGY STAR rating. I need to take the EUI path, but am not sure which building type to use. I think the closest ENERGY STAR comes to addressing this facility type is with the Manufacturing Plant Energy Performance Tool for Pharmaceutical Plants, but that is a stretch. I could enter the plant as an "other" space type in Portfolio Manager and get the EUI there, but I am afraid that will not do it justice. Any recommendations?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 04/25/2012 - 00:49

Nena: If you're pursuing EBOM for this building then I recommend you use the USGBC's alternative energy performance calculator for non-ratable buildings, available from the USGBC site and within LEED Online. Within that tool you can benchmark relative to one of three alternatives: 1) the generic "other" category within Portfolio Manager as you described, 2) your own facility's energy history, or 3) energy use of comparable facilities. Each of these options has their pros & cons, so each should be explored and you should choose the method best suited to your project.

Fri, 05/04/2012 - 17:21

Correct me if I'm reading the reference guide incorrectly, but it's misleading for Case 2 "Option A, B, C" - the EAp2 Case 2 calculator from LEED Online appears to box projects into either Option A, B, or C depending on the space types - if your project can comply with Option A (alternative benchmark score) then you cannot CHOOSE to use Option 2C. Is this correct?

Thu, 05/24/2012 - 22:09

Kim, in my experience, I have heard projects take various routes for the same space type in question. However, the interpretation from the calculator will give you the 53 options of spaces and if 90% of the building does not meet one option than Option 1 cannot be taken.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.