Hello LEED User ND forum, I am preparing my Stage 1 LEED ND project for the SLL Prerequisite Review.
Documented alternative compliance from ND Pilot Projects?
posted by Daniel Costantino on
Hi, Because of my project's size (very large) and its location (international), I will likely need to submit alternative documentation on several credits.
Tenant space with some old, some new HVAC and lighting
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Vanessa Seibert on
I've been reviewing all the CI energy related credits hoping to get a clear answer. As I understand it, the CI energy prerequisite can only apply to the new HVAC systems within the project scope.
can i take a credit for on site renewable energy for green power
posted by Christopher McArdle on
MRc4.2 Copper Piping Joints
posted by Simon Sue on
Per the LEED reference guide and LEEDonline signatory, copper piping joints can only be one of the following: - mechanically crimped - soldered in compliance to ASTM B828 with flux in compliance to
Door proximity
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Elizabeth Crenshaw Hammitt on
Is it an issue if the door to the smoking room is under 25 feet away from a door that leads to a porch area?
Polycyclic aromatic hydrocarbons, PAH
NC-2009 SSc3:Brownfield Redevelopmentposted by Tanja Arnesson on
Hi, My project just got back our Design 2 review, just after we sent in the design credits for the second review the project found old telephone poles within the ground at our project.
FTE in a dormitory
posted by Ashlee Paar on
we received feedback on a recent project that asks us to "distinguish between occupants and residents".