Log in
Forum
Topic

Why restrict to 'medical' processes?

Pilot-Credits EApc3: Medical and process equipment efficiency
posted by Jean Marais on Apr 21, 2010, 12:59 am

Reducing process loads of all types should be a LEED insentive credit wize, but is often pushed back due to the difficalties documenting the exceptions to ASHRAE 90.1 Appx. G for differing...

Last reply: Tristan Roberts, Apr 21, 2010, 1:34 am

Katie, In case you haven't

General forums
posted by David Posada on Apr 20, 2010, 11:17 pm

Katie,
In case you haven't seen it yet, the Minimum Program Requirements (MPR) Supplemental Guidance document provides some help here:

1. The LEED project boundary must include all...

Last reply: Tristan Roberts, Apr 21, 2010, 1:30 am

Get the most out of LEED

Pilot-Credits PC5: Preliminary Integrative Project Planning & Design
posted by Jean Marais on Apr 21, 2010, 1:14 am

This is great, because it will not only maximise the potential of creating greener buildings using LEED as the guide, but also solve so many problems and headaches during the LEED certification...

ND launch

General forums
posted by Cara Mae Cirignano on Apr 20, 2010, 10:33 am

Apologies! I meant to add that the ND launch is expected in late spring. Unfortunately, there isn't a firm date yet, but we're working hard to make it happen as soon as possible. If you're part...

Last reply: Jennifer Perdue, Apr 20, 2010, 10:46 am

ND Fees

General forums
posted by Cara Mae Cirignano on Apr 20, 2010, 10:06 am

these should be released at launch

Required Dates

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by MICHELE HENDRICK on Apr 19, 2010, 1:52 pm

The dates that are required for this credit are very confusing. For Option B "practices must have started before the start of manufacturing but no earlier than 24 months prior to the last...

Last reply: Tristan Roberts, Apr 20, 2010, 8:36 am

Dual Flush- average flow rate

NC-2009 WEp1: Water Use Reduction
posted by Adriana Hansen on Apr 19, 2010, 3:50 pm

According to the calculation showed at document WATER USE REDUCTION - ADDITIONAL GUIDANCE v011209, the average flow rate is defined by:

[(Male full-flush uses/day×full-flush rate)+(Female...

Last reply: Jean Marais, Apr 20, 2010, 3:29 am

FSC Exclusion

NC-2009 MRc7: Certified Wood
posted by Emily Kildow on Feb 9, 2010, 11:15 am

Has anyone ever heard of a project achieving this credit with an exclusion of certain...

Last reply: Sheri Lucas, Apr 19, 2010, 10:31 pm

Retail Space and EAp2/EAc1

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by D. G. on Apr 2, 2010, 8:08 pm

My question is about retail space and EAp2/EAc1. According to page xxiii of the Reference Guide, up to 10% of the floor area can be exempted from all credits (except EQp2) for multitenant...

Last reply: D. G., Apr 19, 2010, 10:14 pm

Going from LEED-NC to LEED-EBOM

General forums
posted by Tristan Roberts on Apr 19, 2010, 6:51 pm

Hi Kash, welcome to LEEDuser—it's good to have you!
It's probably best to think of LEED-...