Which buildings/structures to consider while registering projectEBOM-v4.1 MPR2: Must use reasonable LEED boundariesposted by Wafa Arif on Sep 11, 2023, 4:28 am
I have three office towers on one large property, each connected to a mall via walkways. The shared parking structures beneath these towers serve tenants, mall visitors, and others. My objective... |
|
Pre-cast concrete structure environmental product declarationsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Maiz Rech on Sep 11, 2023, 2:17 pm
Considering the building is built of a precast concrete... |
|
Fire and Police Station Building Type UseNC-v4.1 LTc7: Reduced parking footprintposted by Danielle Waters on Sep 13, 2023, 4:47 pm
I saw on LEEDuser v4 NC LTc7 that Fire Stations could be "General Light Industrial" (1.85/1000 sf), but is it far fetched to consider "Other Public Assembly" (0.25*permitted capacity) if the... |
|
Heat Island Mitigation with Cool WallsCS-v4 INc1: Innovationposted by Benjamín Nieto on Sep 13, 2023, 6:46 pm
Hi, Im currently working on a industrial project pursuing a LEED BD+C Core and Shell v4 certification. We are attempting the ID Cool Walls credit but have encountered some issues gathering... |
|
Baseline for Projects with Several Physically Distinct StructuresNC-v4 MPR3: Must comply with project size requirementsposted by Mike Mentzos on Sep 15, 2023, 6:57 am
All, We are currently working on a hotel project, which consists from several buildings the sum of them is about 4,000 square meters. Each individual bulding is not greater than 2,300... |
|
Ventilation capacity for WarehousesNC-v4 EQp1: Minimum indoor air quality performanceposted by G.J. Teunissen on Sep 15, 2023, 10:06 am
Hi, We have a shipping/receiving design (nothing hazardous) around 1000m² with 15 people. The ventilation requirement according to ASHRAE 62.1 2010. Is (0.6 * 1000) + (5 * 5) = 625 l/s... |
|
Water Analysis- (Maximum concentration exceed 10)NC-v4 WEc3: Cooling tower water useposted by Osman Faroq on Sep 21, 2023, 1:30 am
Dear All, We have conducted water anaysis and showed that the water is with highe quality withount any treatment/filteration and with maximum cyecle of concnetaroin of 16... |
|
Are there any work arounds for the Smoking Rooms especially for Airports in the Middle East?NC-v4 EQp2: Environmental tobacco smoke controlposted by Katrina Hernandez on Sep 21, 2023, 8:51 am
We work on airports quite often and the location of these Airports are in the Middle East -- which everyone knows can be quite hot. LEED V4 does not allow smoking rooms in the building and... |
|
Sample transit documentationCS-v4 LTc5: Access to quality transitposted by Vanessa Rosado on Sep 22, 2023, 8:07 am
Hi My question is about the example provided "The Frick Collection 1E 70th St, New York" for this credit, which is: there is a note saying that "No one transit mode comprises more than 60... |
|
Option 3- Transit corridorND-Plan-v4 SLLp1: Smart locationposted by Vanessa Rosado on Sep 26, 2023, 10:02 am
Hello Leed user Team For this option do we need to follow the same requirements as per LT c5 "Access to Quality Transit"? For example, do we need to take into account the following... |