Log in
Forum
Topic

On Site Renewable Energy

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by Ben Stanley on Jan 25, 2010, 1:27 pm

We recently received the following question related to this credit.

"We are a city owned convention center going for LEED EB O&M. Another city department, (Department of Water &...

Issue-

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Elizabeth Repin on Jan 22, 2010, 5:55 pm

Would the refrigeration/ freezer section of a food distribution warehouse have to meet this / be ventalated? The sq footage of this section is 82,000 square feet.

The areas woulld be ill...

Seems like one rack is okay

General forums
posted by Tristan Roberts on Jan 22, 2010, 10:09 am

You might check with...

when is the weather envelope established?

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by James Weiner on Jan 15, 2010, 4:21 pm

A contractor is choosing to seal glulam beams in place (during framing and prior to sheathing a new construction project) with a product slightly exceeding LEED...

Last reply: Mara Baum, Jan 21, 2010, 1:48 pm

Window in the interiors

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Susan Robertson on Jan 20, 2010, 1:14 pm

If I have a window wall that receives light through another room that has a window wall and is recieveing light from the exteriors. So can this interior window wall be included in the...

Last reply: Carlie Bullock-Jones, Jan 21, 2010, 8:54 am

Different Tvis in one plane of glass

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Jennifer Preston on Jan 20, 2010, 12:16 pm

If I have two different glass types with different...

Last reply: Carlie Bullock-Jones, Jan 21, 2010, 8:14 am

Motel-style dormitory with smoking rooms

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Kimberly Frith on Jan 20, 2010, 3:21 pm

How does this prerequisite apply to a dormitory that has exterior motel-style walkways (no indoor conditioned corridors between rooms) where the residents are allowed to smoke in the individual...

Last reply: Tristan Roberts, Jan 20, 2010, 8:37 pm

Flush monitoring requirements

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Mary Davidge on Jan 20, 2010, 10:50 am

We have a project with two types of spaces, one is a naturally ventilated warehouse and the other is office with package units. At a local ashrae meeting the speaker stated that to achieve the...

Last reply: Tristan Roberts, Jan 20, 2010, 8:02 pm

Using option (3) measuring lighting (%) percent

EBOM-2009 SSc8: Light Pollution Reduction
posted by Reynaldo Castro on Jan 19, 2010, 5:25 pm

Using Option (3) it states under the LEED -...

When does the Performance Period Start?

EBOM-2009 SSc1: LEED Certified Design and Construction
posted by Mark Westover on Jan 18, 2010, 12:42 am

I am sorry about asking the question here, but I could not find anywhere else to ask it.
I am trying to figure out when the performance period starts. The definition in the "Introduction-...

Last reply: Dan Ackerstein, Jan 19, 2010, 1:28 pm