Topic | Recent |
---|---|
Should I consider in this Prerequisite also the Restrooms?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Claudia Rieger on Jul 8, 2010, 2:07 pm
Hi everybody, Now, let´s go to the question, I have a single... Last reply: Carrie Lai, Jul 22, 2010, 10:43 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Victoria Lockhart on May 18, 2010, 9:48 am
not sure if im understanding the Reference Guide correctly: for the calculation do we use the default values for... Last reply: Paul Conrad, Jul 22, 2010, 11:17 am |
|
Air Testing CriteriaNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Vivian Wan on Jul 22, 2010, 2:29 am
Is there any guideline to the sampling criteria such as the measurement interval during the normal occupied hours? In Hong Kong the sampling period required by Env. Dept is on 8-hour basis with... Last reply: Allison Beer McKenzie, Jul 22, 2010, 8:13 am |
|
BAS- Lighitng Control for Hotel SpacesEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Ashu Gupta on Jul 13, 2010, 6:12 am
Is it necessary to integrate the entire lighting to BMS such as Hotel lobby lighting, corridor lighting which is always ON (24*7)? Also should guest rooms lighting integrate to BMS or not... Last reply: Pierce Holstrom, Jul 21, 2010, 6:17 pm |
|
EBOM change from 1993 to 1994 for WEp1/WEc2General forumsposted by Peter Dahl on Jul 21, 2010, 3:00 pm
Also note that the July 19 addenda shifted the pre-/post-1993 fixture baseline to pre-/post-1994. Though this will only affect buildings with plumbing systems installed during 1993 or 1994, the... |
|
Renewable Energy to improve EfficiencyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Heidi Creighton on Jun 17, 2010, 12:19 pm
If I have a PV system to offset the building energy use can I use it to show performance over 19% to meet the prerequisite (like in NC) or does the building efficiency stand alone to show 19%... Last reply: Jenny Carney, Jul 21, 2010, 2:45 pm |
|
ReallyGeneral forumsposted by on Jul 21, 2010, 10:43 am
I can't imagine the USGBC taking out non-potable water consumption out of it without giving some other incentive to pursue collection. Rainwater harvesting costs money and it's a good thing. If... Last reply: , Jul 21, 2010, 11:05 am |
|
From the current FAQ locatedGeneral forumsposted by Tim Rogers on Jul 21, 2010, 10:53 am
From the current FAQ located here: http://www.usgbc.org/ShowFile.aspx?DocumentID=5732 Are international projects eligible... |
|
Feed me!General forumsposted by Joel McKellar on Jul 21, 2010, 10:23 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up July 21, 2010- 10:29 am Joel, we'd love to set this up along with some other forum enhancements.... stay tuned.For specific credit forums, like WEp1, for example, you can subscribe by clicking on the link just below where it says "10 Comments" at the top of the forum. You can also acces this feature through your profile. Log in or register to post comments Bill Swanson Sr. Electrical Engineer Integrated Design Solutions LEEDuser Expert 734 thumbs up July 21, 2010- 10:36 am Revisions are up... Last reply: Bill Swanson, Jul 21, 2010, 10:36 am |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by kelvin duen on Jul 20, 2010, 3:13 pm
I'm having a little confusion as to what "... Last reply: Paul Conrad, Jul 20, 2010, 3:44 pm |