Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

DHC Plant with CFC refrigerant

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Noriko Nagazumi  on 

Our project is served by district heat and cilled water plant. The plant, owned by different componay from our project owner, uses CFC refrigerant for some of chillers.

3
Fri Nov 23, 2012, 8:30 pm

EIFS and IEQ 4 - Group 5 Exterior Applied Products

LEED for Healthcare forum
posted by  Bruce Maine  on 

Good afternoon. I'm stumped as usual. There seem to be no categories in 1113 or the ARB SCM which addresses the EIFS cementitous finishes.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Nov 23, 2012, 4:45 pm

ACP for IEQp1 uses EU Ventilation Norms

General forums
posted by  Jean Marais  on 

Adhering to EN 15251 and EN 13779.

7
Specialist Consultant
EkoWATT CZ
LEEDuser Basic Member
4 thumbs up
Fri Nov 23, 2012, 3:45 pm

Hurricane/Tropical Storm Damage

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Megan Bove  on 

As most are fully aware, the east coast was severely hit by Tropical Storm Sandy. I am currently working on a LEED job that was completely flooded and damage was done.

2
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Fri Nov 23, 2012, 3:57 am

Slow Release Fertilizer Requirements

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Stantec IP - Dupe - Do not use  on 

Can anyone provide any insight into slow-release fertilizer requirements?

3
Fri Nov 23, 2012, 2:23 am

Educational Program

CS-2009 IDc1:Innovation in Design
posted by  Heather Holdridge  on 

If you have more than 2 components to your program, is there an opportunity to earn more than 1 point for this ID credit?

3
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Thu Nov 22, 2012, 1:50 am

Fabric alterations.

CI-2009 EAp2:Minimum Energy Performance
posted by  Graham Langton  on 

Hi all, First post!! Here goes. Regarding complience with section 5.5 of ashrae 90.1 using the prescriptive path. Although not stated directly does the following in section 5.2 apply?

3
Building Services Engineer
PM-Group
LEEDuser Basic Member
1 thumbs up
Wed Nov 21, 2012, 4:04 pm

proposed case model - if design is not completed or CS project

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

proposed case model - if design is not completed or CS project I need some closure.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Nov 21, 2012, 3:34 pm

Feedback Survey

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Melissa Wackerle  on 

Where can I get a copy of the feedback survey? The link above is broken. Thanks in advance.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Nov 21, 2012, 3:32 pm

Principal Project Building Activity Definitions

NC-2009 PIf3:Occupant and Usage Data
posted by  RETIRED   on 

I am trying to locate a document or more information from USGBC regarding the Principal Project Building Activities.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Nov 21, 2012, 3:27 pm