Forum quick links
Terrazzo Sealer Question
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Todd Bundren on
What is the VOC limit for a Terrazzo Sealer? I'm a bit confused about which category it falls under (Sealer, Floor Coating, or other).
Existing HVAC within a New HVAC System
CI-2009 EAp2:Minimum Energy Performanceposted by Nelina Loiselle on
I am working on a tenant space in which the HVAC system is going to be completely redone except for one existing HP unit.
File Uploads
posted by Mina Soliman on
I have a problem in uploading files of Credits on Leed , I Browse files and then nothing changes when i try to upload files and i have to, Urgently .... can anyone help me ?
Janitor room
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Saliha AIT on
Hi, I have two options on my project (currently in design stage).
Undergroung parking under a 12 inches water pool
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Carlos Garcia on
Dear all We have the 100% of parking spaces undercover, in an underground parking (level -1).
G3.1.2.10 Exceptions: e.
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
This applies to cooling only type systems? That means if the proposed system can heat and cool and is in said climate zone, then this exception may not be applied. Right?
Assessing the new MR credits - #2 & 3
posted by Tom Lent on
I find a lot to like in the new LEED MR Credits (MRc2, 3 & 4 Building product disclosure and optimization).
Formwork included?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Katherine Mariano on
Hi All, I am just wondering if formworks are included in the consideration of this credit? - thanks in advance!
Ballast power
CI-2009 EAp2:Minimum Energy Performanceposted by Julio Alvarado on
Hello, We are doing a CI-Retai. It is 5,814.13ft2 bank branch located in a mall.
Fueling Capacity of Charging Stations
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Michelle Rosenberger on
We are installing one 240 volt Level 2 electric charging station at our project. The requirement is 3% of total parking, which in our case is apparently 2 stations.