Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Leasing agreement

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Michael E. Edmonds-Bauer  on 

Does the MER13 need to be requested to future tenants by a leasing agreement?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Dec 12, 2012, 6:46 pm

FTE for a Barracks

NC-2009 PIf3:Occupant and Usage Data
posted by  Christopher Sawyer  on 

My project is a military barracks for 650 cadets on a campus.

7
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Dec 12, 2012, 6:11 pm

Concerns about the proposed transition between V3 & V4

General forums
posted by  Rob Watson  on 

Currently, the proposal is to have a very long uptake period for V4: June 2013 for the ballot and end-of-2013/early-2014 for the launch.

2
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Wed Dec 12, 2012, 4:09 pm

How to start up an existing precertification?

General forums
posted by  Sara Neff  on 

I have inherited two precertified projects and am frankly confused as to how to go about certifying them now.

2
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Wed Dec 12, 2012, 3:37 pm

zip code

NC-2009 PIf2:Project Summary Details
posted by  charles bell  on 

I can't change the zip code on PI f2. Is this linked to some other form?

2
Wed Dec 12, 2012, 3:30 pm

ECS - Other clg Accessories under Primary Cooling

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivy Chen  on 

We would like to find out what have been included in item "Other Clg Accessories" under Primary Cooling in Energy Consumption Summary. In our baseline, Package Terminal Heat Pump is adopted.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Dec 12, 2012, 3:15 am

MPDp1c and NPDc1j - sidewalk definition

General forums
posted by  Tyler Baker  on 

Hello, I have a question about how sidewalk is defined. We have a sidewalk along the street edge of a park, and the park has a playground in it.

3
Wed Dec 12, 2012, 2:08 am

9.4.1.1 mandatories for CS

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Hi everyone! If the project base building scope does not include the lighting fixtures for tenant spaces but wiring stub-outs are, do we still need to have the automatic control device for the "bu

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Dec 11, 2012, 11:47 pm

Water Use Threshold for Credit Eligibility

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Adam Shelly  on 

There should be some sort of water use threshold that the project needs to exceed in order to be eligible for the credit.

2
Tue Dec 11, 2012, 9:50 pm

FSC Mixed vs FSC Recycle on Invoices?

NC-2009 MRc7:Certified Wood
posted by  John Casciato  on 

If my invoice says FSC Mixed for an MDF order, even tough MDF is a recycle product by design, would that go towards MRc4 instead of MRc7 even if the invoice says FSC Mixed?

4
Default Avatar
Certified Wood Products, Inc
LEEDuser Basic Member
0 thumbs up
Tue Dec 11, 2012, 8:33 pm