Forum quick links
CIv2009: Advanced Buildings Core Performance Guide (CPG)
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Marina Horchin on
Hi Everyone, We have two different versions of the CPG!
Multiple Building -Energy Credits
Schools-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
Does the LEED AGMBC require to have totally separate building systems so that the energy-related points can be clearly defined? My project has centralised Energy center which will be supplying chi
Can occupant survey & monitoring be used as ID Credit?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Lance Collins on
Our project is not able to show compliance with the requirements if IEQc7.1, but has still installed a permanent monitoring system and the owner has agreed to conduct occupant comfort surveys every
Fuel Cell & PV energy
NC-2009 EAc1:Optimize Energy Performanceposted by Gaston Viau on
Hi, our project is a commercial building which will get 100% of the electricity from PVs (20%) and Gas Fuel Cells (80%).
NREL TP-55-46101 “Grocery Store 50% Energy Savings” document
NC-2009 EAp2:Minimum Energy Performanceposted by Anna Barton, LEED AP BD+C on
Does anyone know if the NREL TP-55-46101 “Grocery Store 50% Energy Savings” document can be referenced in the calcs for the baseline and proposed refrigeration equipment for the NC 2009 Retail EAp2
Colorants added at the Point-of-Sale
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Laurent Kanago on
This is in reference to Green Seal GS-11 section 4.4 and 4.5. I am working on a project that is looking to use Dryfall Paint. the Flat paints meet the
What is a "view factor?"
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Lauren Ulmer on
In the Reference Guide, under Exemplary Performance for this credit, item #4 mentions a "view factor." What is that? I can't find an explanation of it in the Reference Guide or on LEED User.com.
Recycled content counted as a regional material
NC-2009 MRc5:Regional Materialsposted by Sara Heppe on
I am getting conflicting information about the allowable extraction/harvesting point for recycled content in materials.
Treating CUP as a DES?
posted by Irina Foster on
Hi, I am working on a LEED Healthcare project. The hospital building is phase 1 of a number of phases within a large master plan area.
Commissioning Walk-in Freezers / Coolers
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Richard Woodward on
We have a mixed use new office / commercial kitchen project with owner occupiers.