Net metering

NC-2009 EAc2:On-Site Renewable Energy
posted by  Michael Beattie  on 

Our project will support a PV array capable of supplying 15% of the building's electrical needs.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jan 29, 2013, 7:06 pm

including furniture in all MR credits

NC-2009 MRc2:Construction Waste Management
posted by  Vera Voropaeva  on 

After the first review we received a comment that furniture calculations should be included in all MR credits 3-7. Furniture is applicable for reused material and thus counted toward MRc3.

2
Tue Jan 29, 2013, 5:44 pm

Biodiesel?

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  American University  on 

The glossary definition of "alternative-fuel vehicles use low-polluting, non-gasoline fuels such as electricity, hydrogen, propane, compressed natural gas, liquid natural gas, methanol, and ethanol

3
Tue Jan 29, 2013, 4:39 pm

Green Walls

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Marcio Alberto Casado Pereira  on 

Hi all! Can I get any benefit from having green walls in my project, for the purpose of this credit? P.S: It is a Previously Developed Area.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jan 29, 2013, 4:15 pm

Which type of water needs to be filtered?

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Marcio Alberto Casado Pereira  on 

Dear all, Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct?

7
Tue Jan 29, 2013, 12:47 pm

Health Care - New Construction

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  William Kelly  on 

For IEQ credit 6.1 Controllability of Systems - Lighting: The requirements for patient areas states "to provide individual lighting controls for 90% (minimum) of patients to enable adjustments to s

4
Mon Jan 28, 2013, 8:22 pm

Submitting Credits at Very End?

General forums
posted by  Dave Wortman  on 

We have a project for which we did a design phase submittal- we are now nearly completion on our construction phase submittal.

4
Mon Jan 28, 2013, 7:14 pm

IEQ Pr1 - work code in France in place of ASHRAE

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Nicolas MOLLE  on 

Can you confirm me that it is possible, in France, to use the work code to determine the air rate in place of the ASHRAE 62.1-2007 in the places where this local code is more stringent ?

3
Mon Jan 28, 2013, 3:38 pm

Increasing Space Ventilation Efficiency by Increasing Vpz

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Ed Floyd  on 

Question seems to simple to me but I can not find a definate answer. Is it acceptable / Common to increase the primary air flow to a critical zone to increase the over system ventilation efficienc

2
Fri Jan 25, 2013, 12:31 am

The LEED HC vs LEED NC question ....again

LEED Rating System Selection
posted by  Kathy Wislocky  on 

Our healthcare project will be a licensed facility by the state's deparment of public health. However, it is a community health center and not part of a hospital campus.

3
Project Manager
Wilson Architects
LEEDuser Basic Member
2 thumbs up